General Dynamics Repairs USS Hartford

Tuesday, June 09, 2009

The U.S. Navy has awarded General Dynamics Electric Boat a $15.8 million contract to plan and perform repair work on USS Hartford (SSN-768), a Los Angeles-class attack submarine damaged March 20, 2009, in a collision with the Navy amphibious ship, USS New Orleans, in the Strait of Hormuz.

Under the terms of the contract, Electric Boat will perform planning work, material procurement and fabrication of a hull patch and a bridge access trunk, as well as planning and material procurement for the port retractable bow plane. Electric Boat also will perform planning work on the sail to restore USS Hartford to full-service condition. Work is expected to be completed by Oct. 31.

(www.gdeb.com)

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Container Ship Delivers First Boxes to Great Lakes Port

The US Coast Guard say that the 'Fortunagracht', a 450-foot Dutch-flagged container ship, has delivered the first-ever load of containerized cargo to the Great Lakes.

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1476 sec (7 req/sec)