Shell Begins Production at Parque das Conchas

Wednesday, July 15, 2009

Shell has started production at its multi-field Parque das Conchas project 110 km off Brazil's southeast coast, where heavy oil resources lie beneath waters nearly two km deep in the Campos Basin. Parque das Conchas is a two-phase project with initial production drawn from Abalone, Ostra and Argonauta B-West. The first phase, now on-stream, involves nine producing wells and one gas injector well, which the second phase will focus on the Argonauta O-North field. Electric pumps of 1,500 horsepower drive the oil 1,800 m up to the surface for processing in a floating, production, storage and offloading vessel (FPSO), Espírito Santo, which is more than 330 m long. It can process 100 thousand barrels of oil and 50 million cu ft of natural gas per day and store nearly 1.5 million barrels of oil for shipment to shore by transport tankers.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

USCG Free Boat from Ice Near Woods Hole

A Coast Guard crew responded to a fishing vessel trapped in ice in Woods Hole Passage, Woods Hole, Massachusetts, Saturday. At about 3 p.m., the crew of the fishing boat Capt.

Tug Boat Owner Jailed After Crew Man Dies

A tug boat owner was today was given an 8 month custodial sentence after his crew member died trying to reattach a tow line in a violent storm. During today’s hearing at Southampton Crown Court,

COMPIT to Showcase Smarter Ships, Systems & Solutions

The 14th International Conference on Computer and IT Applications in the Maritime Industries (COMPIT) will take place from 11th to 13th May 2015 in Ulrichshusen, Germany.

Offshore

Hercules Offshore Shares Fall 33%

Drilling contractor Hercules Offshore Inc's shares fell as much as 33 percent to a record low on Friday, a day after Deutsche Bank cut its price target on the company's stock to $0.

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

Mexico Approves 5 Shallow Water Areas in Round One Oil Tender

Mexico has approved the terms for five shallow water areas containing around 355 million barrels of oil equivalent as part of its Round One tender to open up the country's oil fields,

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1501 sec (7 req/sec)