Keel Laid for 3rd National Security Cutter

Tuesday, July 21, 2009

The U.S. Coast Guard and Northrop Grumman laid the keel for the future Coast Guard Cutter Stratton, the service's third National Security Cutter, at 1 p.m, July 20. At Northrop Grumman Shipbuilding's Gulf Coast shipyard, Pascagoula, Miss., ceremoniously marking the beginning of Stratton's construction.

First lady Michelle Obama will serve as Stratton's sponsor.  This is the first time a first lady has ever sponsored a Coast Guard cutter.  As the sponsor the first lady will be involved in the life of the cutter.  This is Obama's first formal association with a United States Coast Guard cutter and serving as Stratton's sponsor is an extension of her commitment to supporting America's men and women in uniform and their families.

"I am honored to serve as sponsor of the Coast Guard Cutter Stratton, named after one of the most extraordinary women to serve our nation in uniform," said Obama.  "Every day, the United States Coast Guard keeps our families and communities safe at home and contributes to the defense of our nation overseas.  This vessel will embody the strength of today's military and the enduring courage of our Coast Guard's men and women."

"The keel laying is a significant event in our surface acquisition program," said Rear Adm. Ronald J. Rábago, the Coast Guard's assistant commandant for acquisition.  "We are especially proud and honored that this ship will be sponsored by the first lady.  We are all pleased and impressed with the dedication of the men and women of the Coast Guard's Gulf Coast Project Resident Office and of the Pascagoula shipyard.  Their commitment to excellence in producing the National Security Cutter class to meet the demands for Coast Guard missions is truly inspiring." 

Each of the NSCs will be named for a Coast Guard "legend," including former commandants Adm. Ellsworth P. Bertholf and Adm. Russell Waesche, as well as Founding Father and first U.S. Secretary of the Treasury Alexander Hamilton.  Stratton is the namesake of Capt. Dorothy Stratton who directed the Coast Guard's Women's Reserve, or SPARs, during World War II.  Stratton was a professor and dean for women at Purdue University, Ind., and in 1942 she was the first woman accepted into the Coast Guard's Women's Reserve.  She and her colleagues helped the Coast Guard live up to its motto Semper Paratus, "Always Ready" by working to ensure the service was ready for front-line sea duty in America's war effort.  SPARs fulfilled many vital roles during the war and their efforts helped pave the way for women to serve throughout our Armed Forces.

The Coast Guard recently accepted the first NSC, Bertholf, which entered service following completion last year.  Northrop Grumman Shipbuilding's Gulf Coast shipyard in Pascagoula is under contract to build three NSCs including Waesche, which is approximately 90 percent complete, Stratton, which is more than 20 percent complete, and Hamilton, for which the Coast Guard has procured long lead time material.

In contrast with older cutters the 418-foot long NSCs feature increased range and endurance (60 to 90 day patrol cycles); more powerful armament; larger flight decks; chemical, biological and radiological environmental hazard detection and defense; and improved Command, Control, Communications, Computers, Intelligence Surveillance and Reconnaissance equipment.  These features enhance Coast Guard and U.S. Navy interoperability under the National Fleet plan. 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

USNS Spearhead Delivers Materials to Ghana Charities

The U.S. Navy’s joint high-speed vessel USNS Spearhead (JHSV 1) delivered wheelchairs and medical supplies to Ghanaian non-governmental organizations March 26, 2015.

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

Vessels

Gulf Bridge Express Service to End

The Gulf Bridge Express Service will shortly be terminated with the last roundtrip voyage being MV Saint Nikolaos voyage 00008S, ETA New Orleans on April 22, 2015.

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1252 sec (8 req/sec)