East Africa Gets High-Speed Web

Wednesday, July 29, 2009

According to a July 23 BBC News report, the first undersea fibre-optic cable, operated by African-owned firm Seacom, connects South Africa, Tanzania, Kenya, Uganda and Mozambique to Europe and Asia. The cable, which is 17,000km long, took two years to lay and cost more than $650m. The cable was due to be launched in June but was delayed by pirate activity off the coast of Somalia.

(Source: BBC News)

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Cat C9.3 ACERT to Debut at WorkBoat

Caterpillar Marine unveils Cat C9.3 ACERT power solutions for the commercial marine market   Caterpillar Marine has launched the Cat C9.3 ACERT Marine platform,

EuronavSells Suexmax Cap Laurent

Euronav NV announced the sale of its Suezmax Cap Laurent for $22.25 million. The 1998-built 146,145-dwt vessel was wholly owned by Euronav.    The vessel was

Seajacks Scylla Delivered

Seajacks Scylla, touted as the world's largest and most advanced wind farm installation and offshore construction vessel, has been delivered by the Samsung Heavy Industries Shipyard in Geoje,

Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0664 sec (15 req/sec)