East Africa Gets High-Speed Web

Wednesday, July 29, 2009

According to a July 23 BBC News report, the first undersea fibre-optic cable, operated by African-owned firm Seacom, connects South Africa, Tanzania, Kenya, Uganda and Mozambique to Europe and Asia. The cable, which is 17,000km long, took two years to lay and cost more than $650m. The cable was due to be launched in June but was delayed by pirate activity off the coast of Somalia.

(Source: BBC News)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Migrants Survivors Tell of Struggle at Sea

The bodies of 21 women and one man were brought ashore to Sicily on Friday as fellow migrants described scenes of panic and violence when water poured into their dinghy.

SENER Presents Two FORAN Papers at the Morintekh

In June, the SENER engineering and technology group participated in the 17th Morintekh – Praktik 2016 Scientific Conference, in the city of St. Petersburg, Russia.

Asia-N.Europe Box Rates Fall 8.1 pct

Freight rates for transporting containers from ports in Asia to Northern Europe fell 8.1 percent to $713 per 20-foot container (TEU) in the week ended on Friday,

 
 
Maritime Contracts Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0746 sec (13 req/sec)