East Africa Gets High-Speed Web

Wednesday, July 29, 2009

According to a July 23 BBC News report, the first undersea fibre-optic cable, operated by African-owned firm Seacom, connects South Africa, Tanzania, Kenya, Uganda and Mozambique to Europe and Asia. The cable, which is 17,000km long, took two years to lay and cost more than $650m. The cable was due to be launched in June but was delayed by pirate activity off the coast of Somalia.

(Source: BBC News)

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

26-year Jail Term Sought for Concordia Master

An Italian prosecutor asked a court on Monday to sentence the captain of the Costa Concordia cruise liner to more than 26 years in jail for his role in the 2012 disaster that killed 32 people.

Boost for Offshore Wind Energy

As part of President Obama’s Climate Action Plan to create American jobs, develop domestic clean energy resources and cut carbon pollution, Secretary of the Interior

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1049 sec (10 req/sec)