East Africa Gets High-Speed Web

Wednesday, July 29, 2009

According to a July 23 BBC News report, the first undersea fibre-optic cable, operated by African-owned firm Seacom, connects South Africa, Tanzania, Kenya, Uganda and Mozambique to Europe and Asia. The cable, which is 17,000km long, took two years to lay and cost more than $650m. The cable was due to be launched in June but was delayed by pirate activity off the coast of Somalia.

(Source: BBC News)

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Henderson, Hanes & Associates Opens Doors in Miami

Ocean Engineering/ Naval Architecture Firm Brings Innovation to the Mega Yacht Community The Miami-based ocean engineering and naval architecture firm of Henderson & Associates, Inc.

Austal Launches Trenton (JHSV 5)

Second Joint High Speed Vessel to be launched at Austal in 2014 On September 30, 2014, Austal USA successfully completed the launch process of Trenton (JHSV

DOF Installer Sells Offshore Vessel

DOF Subsea AS subsidiary, DOF Installer ASA, reported the sale of one of its three sister ships, an anchor handling tug supply (AHTS) vessel, to an international buyer.

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0976 sec (10 req/sec)