New USACE Contract

Sunday, August 23, 2009

Weeks Marine, Inc., Covington, La., was awarded on Aug. 14, 2009 a $14,877,000 firm-fixed-price contract for Atchafalaya River and Bayous Chene, Boeuf, and black, Atchafalaya Bar Channel, Maintenance Dredging C/L Sta. 475+00, Non-Continuous (09-2), St. Mary Parish, La.  Work is to be performed in St. Mary Parish, La., with an estimated completion date of Dec. 12, 2009.  Bids were solicited using the World Wide Web with two bids received.  U.S. Army Corps of Engineers, New Orleans District, New Orleans, La. is the contracting activity (W912P8-09-C-0103).

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

U.S., India to Seal Nuclear Deal

The United States and India have reached a breakthrough on two issues holding up civil nuclear cooperation between them, U.S. President Barack Obama told a news conference in New Delhi on Sunday.

U.S. Refinery Workers' Contract Talks Moving Slowly

With just a week of bargaining left until the national contract for U.S. refinery workers expires, the United Steelworkers union (USW) said talks with oil company

MSC Sinfonia Upgradation at Fincantieri Shipyard

Extension operations on MSC Sinfonia, the second out of four MSC cruise ships to undergo the Renaissance Programme of enhancements, have begunin the past days at Fincantieri shipyard in Palermo.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4030 sec (2 req/sec)