Proposed Shipbuilding Centers of Excellence

Sunday, September 20, 2009

Davie Yards Inc. (TSX:DAV) introduced its proposal for the implementation of a National Shipbuilding Procurement Strategy aimed at renewing the federal fleet and building world-class shipbuilding capability in Canada, while providing more predictable work for the maritime industry.

"Davie's proposal is based on our belief that Canadian yards can achieve a competitive position vis-à-vis European yards in building complex ships. In order to create such competitiveness, we are proposing that major federal shipbuilding projects be allocated to a select number of yards that will develop expertise and thus make it possible to secure the right costs and prices for the fleet renewal program," explained Steinar Kulen, President and Chief Executive Officer at Davie.

Davie's proposal endorses the allocation of Major Crown Projects of the fleet renewal program to Centres of Excellence based on the technology required and the nature of the projects. Under such an allocation, one of the Centers of Excellence should focus on building combat ships and the other on building commercial type ships without heavy combat equipment and on developing Canadian expertise on heavy ice class ships. Smaller yards in Canada can be allocated contracts for the smaller and less complex ships mentioned in the program.

The Centres of Excellence selected must be able to cooperate on the work packages for the ships they are allocated. Therefore, Davie and Halifax-based Irving Shipbuilding Inc. have agreed to cooperate by sharing technology, facilities, and capabilities. It has been proposed that the Government select Irving to build combat vessels and Davie to build commercial ships.

(www.davie.ca)

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1596 sec (6 req/sec)