Coast Guard Reopens Lower Mississippi River

Wednesday, October 07, 2009

The Coast Guard reopened the Mississippi River at 8:35 a.m. Sunday, Oct. 4, 2009, from mile markers 531 to 541. The Coast Guard closed the Mississippi River to all vessel traffic as the result of a towing vessel allision at approximately 5:20 a.m., this morning. The allision between the towing vessel C. B. Ford and the Old Greenville Bridge resulted in six rock barges breaking free. All barges have been recovered. The incident is under investigation.

Maritime Reporter October 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Algoryx Simulation, Kongsberg Maritime Ink R&D Deal

Kongsberg Maritime and Algoryx Simulation have entered a five year agreement, which supports Kongsberg Maritime’s continuing development of fidelity and realism

‘VoyagOR’ Project Seeks Shipping Participants

Shipping companies are being sought to assist the ‘VoyagOR’ project, which aims use route optimization systems to make shipping operations more cost-effective.   The

APL launches U.S.-flagged Guam Saipan Express

APL today introduced a new fortnightly U.S.-flagged service to Guam and Saipan. The Guam Saipan Express (GSX) will connect with APL’s weekly U.S.-flagged Eagle Express service (EX1) in Yokohama,

Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1148 sec (9 req/sec)