Todd Shipyards $12.5M add-on to CG Contract

Sunday, October 18, 2009

According to a report from the Puget Sound Business Journal, Todd Shipyards Corp. said on Oct. 15 that the U.S. Coast Guard is awarding it a $12.5m option on a previously awarded contract to make additional alterations and repairs on the icebreaker USCGC Healy.

(Source: Puget Sound Business Journal)
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

3D Machining Puts Wind in the Sails

With ESPRIT CAM software, Armor Mécanique has the wind in its sails; 50% time savings, better quality and new markets thanks to 3D machining Established in 1984

Two ASD Tugs Delivered to URAG

URAG has taken delivery of two ASD 2411 Tugs to add to its existing fleet. Named Brake and Perfect, the new vessels have joined their sister ship Prompt in the

HHI’s 2014 Results Fall Short

The world’s biggest shipbuilder, Hyundai Heavy Industries (HHI), held its 41st Annual General Meeting of Shareholders in Ulsan, South Korea.   The meeting agenda

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1259 sec (8 req/sec)