Panama Canal CEO Briefs Miami Leadership

Tuesday, November 10, 2009

Panama Canal Authority (ACP) Administrator/CEO Alberto Alemán Zubieta briefed government and business leaders on the progress of the Panama Canal Expansion Program at an event in Miami, Fla. on Nov. 6. Alemán Zubieta confirmed expansion is moving ahead on-time, on-budget and will facilitate trade between the Port of Miami and the Panama Canal.
 
“Expansion is moving ahead as planned and will build a new lane of traffic along the Canal through the construction of a new set of locks. Anticipated to be complete by 2014, the project will double the waterway’s capacity and allow more traffic and wider ships to transit,” said Alemán Zubieta. “The Port of Miami will be in a key strategic position to accommodate the world’s largest cargo vessels as a result of the expanded Panama Canal."
 
The event, organized by the Port of Miami, brought together high-level government and business representatives including Ambassador of Panama to the United States Jaime E. Alemán, Miami-Dade Board of County Commissioners Dennis C. Moss and Port of Miami Director Bill Johnson.
 
Johnson provided an update on the Port’s capital improvement programs to fully maximize the benefits of the expanded Canal. According to Johnson, the Port is dredging its current draft from 42 to 50 feet to accommodate larger ships. The Port Tunnel is another significant project of the Port, designed to ease congestion and provide more expedited delivery of goods to distribution centers in the area. Both projects are expected to finish by expansion’s anticipated completion date of 2014.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

200th Airbus A320 Shipset Loaded for China

The 200th shipset for Airbus’s A-320 final assembly line (FAL) in Tianjin, China, was loaded on to the containership COSCO Hope at HHLA’s Container Terminal Tollerort

Private Equity Drives New Ship Buys

Ship Registries are an excellent bellwether of industry health and trends, and when Maritime Reporter & Engineering News sought answers to some topical questions,

VSTEP Wins Mexican Navy Simulator Contract

The Mexican Navy selected VSTEP to supply a Class A NAUTIS Full Mission Bridge (FMB) Simulator and 24 NAUTIS desktop trainer stations for the Naval Academy in Veracruz.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0787 sec (13 req/sec)