Wärtsilä Designed Research Vessel for India

Monday, November 23, 2009

Wärtsilä, a ship power system integrator and solution provider, has signed a contract to design and supervise the construction of a modern oceanographic research vessel for the marine wing of the Geological Survey of India (GSI). The order was received in October.
 
In addition to design and supervising the construction process, Wärtsilä will be involved in selecting the onboard scientific instruments, and in arranging training for GSI scientists to ensure that the vessel's capabilities are fully utilized. Wärtsilä know-how and the company's global presence guarantee that the new vessel's scientific team will have the best possible support.
 
"The new vessel is the third of its kind that Wärtsilä is designing for India," said Arne Stenersen, Managing Director, Wärtsilä Ship Design in Norway. "The first one, Sagar Nidhi, is already in service and being operated by the National Institute of Ocean Technology. She is expected to support research work in the Indian Ocean and the Antarctic. Sindhu Sadhana, the second vessel, is under construction."
 
Wärtsilä has 120 days to create a totally new design. "Our designers will take full account of the scientists' needs," said Egil Sandvik, Sales Manager, Wärtsilä Ship Design. "Good facilities for handling equipment, laboratories and workshops, ample space for living quarters and meetings, the correct positioning of transducers and last but not least, good levels of comfort."
 
A high-speed LAN and internet connections will link the vessel's control rooms, laboratories and accommodation to the outside world. The vessel designers have to reproduce the working conditions enjoyed by scientists ashore.

"It's an interesting design challenge," said Sandvik. "She has to be capable of carrying out complicated operations such as handling ROVs (Remotely Operated Vehicles), supporting manned underwater submersibles and controlling autonomous drills that can drill up to 150 metres below the seabed at depths of a thousand metres - not to mention the collection of seismic data and simple operations such as water and soil sampling. The demands and requirements associated with future tasks always have to be kept in mind."
 
The new vessel will have accommodation for 69 people. With an overall length of 311.6 ft, breadth of 62.3 ft, maximum draught of 19.6 ft and speed of 14 knots, it will have an endurance of 45 days. Completion of the project is scheduled for the first quarter of 2012.
 
(www.wartsila.com)

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Propulsion

Mexican Navy Delegation Visits NSSA

The U.S. Navy reported that its Norfolk Ship Support Activity (NSSA) welcomed the Mexican Navy Delegation to Building CEP-200, Naval Station Norfolk, Aug. 21 for

MN 100: Caterpillar Marine

Neumühlen 9 22763 Hamburg/Germany Tel: (713) 895-1449 Email: cat_power@cat.com Website: www.marine.cat.com Managing Director: Nigel Parkinson The Company: Caterpillar

MARAD: Total Fuel Cycle Study for Natural Gas

The Maritime Administration (MARAD) released a study that evaluates total fuel cycle emissions for natural gas versus conventional marine fuels. Results showed

 
 
Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1725 sec (6 req/sec)