UAF Arctic Research Vessel to be Built

Thursday, December 10, 2009
Image courtesy of the University of Alaska Fairbanks

More than three decades ago, marine scientists in the United States first identified the need for a research vessel capable of bringing scientists to Alaska’s icy northern waters. The University of Alaska Fairbanks has announced its intent to award a $123m contract that will meet that need. The university has selected Marinette Marine Corporation of Marinette, Wis. to build the 254-ft Alaska Region Research Vessel.

When complete, the vessel will be one of the most advanced university research vessels in the world and will be capable of breaking ice up to 2.5 feet thick. According to project leaders, the ARRV’s home port will be in Alaska, most likely at UAF’s Seward Marine Center.

“Ocean scientists need this ice-capable vessel now, more than ever before, to study the changes occurring in arctic waters,” said Denis Wiesenburg, a co-principal investigator on the project and the dean of the UAF School of Fisheries and Ocean Sciences.

The $123m for the ship construction contract is funded entirely by the American Recovery and Reinvestment Act.  The total cost for the project is $200m.

“In the short term, constructing this world-class research vessel will create American jobs to help our nation pull out of the current recession,” said Sen. Mark Begich. “The University of Alaska has dreamed of having a new research vessel for decades and I am thrilled to see work will soon get underway through the American Recovery and Reinvestment Act. Once complete, the ARRV will be a state-of-the-art platform to conduct the scientific research necessary for Alaskans to understand the challenges we’re feeling from climate change and its implications on the changing arctic environment.”

The vessel will be owned by the National Science Foundation and operated by UAF as part of the U.S. academic research fleet. It will be used by scientists in the U.S. and international oceanographic community through the University-National Oceanographic Laboratory System. The vessel was designed by The Glosten Associates, a marine architecture firm in Seattle.

After the ship has been completed, the crew will take the vessel from the shipyard through the Great Lakes-St. Lawrence Seaway transit system and the Panama Canal to Alaska in 2013. While in transit, scientists and crewmembers will test the scientific components of the ship in preparation for unrestricted science operations beginning in 2014.

In addition to its ice-breaking capabilities, the ARRV will allow researchers to collect sediment samples directly from the seafloor, host remotely operated vehicles, use a flexible suite of winches to raise and lower scientific equipment, and conduct surveys throughout the water column and sea bottom using an extensive set of research instrumentation.

The ship will be able to transmit real-time information directly to classrooms all over the world. The vessel design strives to have the lowest possible environmental impact, including a low underwater-radiated noise signature for marine mammal and fisheries work. The ARRV will have accommodations for up to 26 scientists and students at a time, including those with disabilities.
 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Horizon Delivers Towboat Marty Cullinan for FMT

In June 2016 Horizon Shipbuilding, Inc. of Bayou La Batre, Ala. delivered the M/V Marty Cullinan, a 120’ towboat with a retractable pilot house, to its home port of New Orleans, La.

New Dredger for North Carolina’s Coastal Waterways

The North Carolina Department of Transportation recently took delivery of a new, fully customized cutter suction dredge, which it christened the Dredge Manteo in a ceremony held April 28,

New 'Mega Passenger Ship' for Star Cruises

Elomatic Ltd and Deltamarin Ltd have signed a tri-party engineering contract with shipbuilder MV Werften for the design of Star Cruises’ new Global Class “mega passenger ship,

Education/Training

Mozambique Workshop Supports Seafarer Training and Assessment

An International Maritime Organization (IMO)-led workshop in Maputo, Mozambique is supporting countries in south-eastern Africa in implementing the STCW (Standards of Training,

Maersk Training Bullsh on India

Maersk Training, part of the Denmark based A.P. Moller-Maersk, is betting on the Indian training centre, reports the Hindu. India is one of the 10 Centre’s that is making profits.

Safety and Preparation on the Brownwater Radar

Weather Channel Forecasters are predicting a “near-average” hurricane season for 2016, but warn that an average season does not mean businesses and residents shouldn’t prepare for the worst.

Vessels

Horizon Delivers Towboat Marty Cullinan for FMT

In June 2016 Horizon Shipbuilding, Inc. of Bayou La Batre, Ala. delivered the M/V Marty Cullinan, a 120’ towboat with a retractable pilot house, to its home port of New Orleans, La.

New Dredger for North Carolina’s Coastal Waterways

The North Carolina Department of Transportation recently took delivery of a new, fully customized cutter suction dredge, which it christened the Dredge Manteo in a ceremony held April 28,

New 'Mega Passenger Ship' for Star Cruises

Elomatic Ltd and Deltamarin Ltd have signed a tri-party engineering contract with shipbuilder MV Werften for the design of Star Cruises’ new Global Class “mega passenger ship,

 
 
Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0806 sec (12 req/sec)