EPS Supports Navy SCC Cost Study

Wednesday, January 20, 2010

EPS Corporation has been awarded a $200,000 contract to support the Ship to Shore Connector (SCC) cost study for the Department of Navy. The SSC is intended to provide the functional replacement for the Navy’s Landing Craft Air Cushion (LCAC) hovercraft currently in service. To meet the mission requirements for the SSC, this next -generation platform must be designed, developed and produced to reduced operations and maintenance costs, and improved reliability and maintainability. EPS Navy Systems an EPS business unit has assembled a team of subject matter experts to perform the studies required and apply its hovercraft design and construction experience to the mission set by the office of the  Naval Sea Systems Command (NAVSEA). Over the 60-day study EPS will prepare and supply the Department of Navy with engineering requirements for repair, replacement, and integration of highly efficient advanced lightweight Fiber Reinforced Plastic (FRP) laminates using glass, Kevlar and carbon fiber for the SSC functional baseline design, specifically in the area of shafting, propulsor blades, shroud, lift van volute, bow thruster nozzle, rudders, and FOD screens structural components. Furthermore, EPS engineers will assess SSC parts support for these composite components throughout the life cycle of the program, as well as required technical assistance pertaining to parts support.
 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Petrobras Downgrade Shakes Market

Moody's shocked bond investors this week with a surprise two-notch downgrade that put Brazilian oil company Petrobras in junk territory. The move was seen by some investors as overly assertive,

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

Davie Building LNG-powered Ferries

Canadian shipbuilder Davie held a keel laying ceremony for MV Armand-Imbeau II, marking the beginning of the hull assembly for this first of two sisterships under

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1149 sec (9 req/sec)