USS Ashland Loads Supplies for Haiti

Thursday, February 04, 2010
Photo courtesy U.S. Navy

Amphibious dock landing ship USS Ashland (LSD 48) moored at Naval Station Guantanamo Bay, Cuba Feb. 1-2 to on load food, water and supplies for the Haiti relief effort.

Ashland took on more than 200 pallets of supplies, including more than 35 cases of bottled water, approximately 10,000 meals-ready-to-eat (MREs), baby food, baby diapers, mail for service members in Haiti and essential maintenance parts for U.S. ships providing the relief efforts in the area.

Ashland was on a regularly scheduled deployment to the U.S. 5th Fleet Area of Responsibility when given orders to provide relief efforts in the Caribbean. Ashland supported humanitarian operations by providing its flight deck to U.S. Navy and Marine Corps aircraft.
 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Navy Unmanned Aircraft Sets the Bar

The Navy's X-47B unmanned aircraft has completed its final test aboard 'USS Theodore Roosevelt' (CVN 71) and has returned to its home base at Naval Air Station Patuxent River after eight days at sea
,

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

News

USCG, National Park Service Rescue Sea Turtle

Members from the U.S. Coast Guard and National Park Service rescued a loggerhead sea turtle Sunday in Oregon Inlet. Watchstanders at Coast Guard Sector North Carolina

Bulk Equipment is Delivered to Syzran Refinery

A reactor and a cold high-pressure separator is delivered to the site of Rosneft subsidiary Syzran Refinery for the constructed diesel hydro-treater. The unit

Achinsk Refinery Resumes Operation on Tight Schedule

Achinsk Oil refinery, suspended after the incident of June 15, 2014 has recovered the processes of primary crude oil processing on a tight schedule, according to the plan of repair activities.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1861 sec (5 req/sec)