A&P Birkenhead Welcomes First Vessel

Monday, August 12, 2002
A&P Birkenhead has drydocked its first vessel since A&P Group acquired the facility in 2001. The vessel involved is a 1,537dwt general cargo vessel Kay L, which is owned by German shipping company Reederei M. Lauterjung KG, Emden. The vessel was trading in the Irish Sea area when it suffered rudder problems and had to enter dry dock for repairs. The vessel will undergo some additional general repairs whilst in dry dock. General Manager at A&P Birkenhead, Martyn Drye commented: "Our workforce has moved swiftly to ensure that the dry dock was available immediately ensuring that we maintained an efficient service to the customer. Our engineers are working with the owners Superintendent to ensure the vessel has a speedy return to active service.”

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter March 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Skandi Paraty Delivered and On-hire

Skandi Paraty, owned by Norskan Offshore Ltda, has been delivered from the yard and went on-hire on a four years contract with Petrobras.   Skandi Paraty is an AHTS,

Diana Containerships, MSC Enter Time Charter Deal

Diana Containerships Inc. announced that, through a separate wholly-owned subsidiary, it entered into a time charter contract with MSC-Mediterranean Shipping Co.

Baltic Dry Bulk Index Dips on Weak Demand

The Baltic Exchange's main sea freight index, tracking rates for ships carrying dry bulk commodities, continued to dip on Wednesday due to sluggish demand across vessel segments.

Ship Repair & Conversion

Sipu Muin Modernization Work to Begin in May

Canadian Coast Guard plans upgrades for Air Cushion Vehicle   A scheduled modernization of the Canadian Coast Guard CCGS Sipu Muin will see the Air Cushion Vehicle

Raytheon Anschütz Steering Gear Control for Luxury Cruise Ships

The German navigation system manufacturer Raytheon Anschütz was awarded a retrofit contract of steering gear control systems for two luxury cruise ships chartered by Noble Caledonia Ltd.

Ferry Drydocking Completed on 2-day Turnaround

Great Lakes Shipyard hauled out the Kelleys Island Ferry Kayla Marie on April 18 for its USCG five-year inspection survey. The yard completed all work, and refloated the vessel two days later,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0708 sec (14 req/sec)