A&P Birkenhead Works on HMS Bulwark

Thursday, June 03, 2004
A&P Birkenhead Ltd, part of the A&P Group, has been awarded the contract for the ‘pre-acceptance’ drydocking of BAE Systems’ newbuild HMS Bulwark (L15) prior to its delivery to the UK Ministry of Defence (MoD).

The vessel is due to arrive in Birkenhead during early June this year (2004). Whilst in drydock, work will include final removal of the hull launch ‘poppets’ and complete coating of its underwater hull, plus other work as required by BAE Systems. In order to achieve the high standards of paintwork required for the vessel, the hull is to be covered under a special containment system, which will provide protection from the weather and allows heating to be applied to suit the coating application should the climatic conditions not achieve specified requirements.

HMS Bulwark is a 18,500 ton Albion Class Landing Platform Dock (LPD) vessel designed to be used during amphibious assault. She was launched in Barrow-in-Furness in November 2001. The vessel is second in her class to HMS Albion, and is expected to enter service during 2005. The two ships were part of an order placed by the MoD with BAE Systems worth £450m. The LPDs replace HMS Fearless, which retired from service in March 2002, and HMS Intrepid which was decommissioned several years ago. Clive Towl, Managing Director, A&P Birkenhead Ltd, said “We are delighted to be awarded this contract. HMS Bulwark will be the first White Ensign vessel to be worked on by A&P Birkenhead Ltd, and complements other MoD vessels which have recently undergone repairs within our A&P facilities on Tyneside and at Falmouth”.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Report: Ports Lack Maintenance Support

The latest Barometer Report from Trelleborg has revealed a huge gap in the maintenance requirements of port owners and operators, and the support that suppliers are able to provide.

Pine Galaxy to Arrive SF Bay Wednesday

The disabled mixed-products tanker Pine Galaxy is expected to arrive in San Francisco Wednesday morning. The ship is being towed by commercial tug to San Francisco Bay.

Industry Partnership to Enhance BOP Maintenance

The maintenance of blowout preventers (BOPs) has significant financial, logistical and safety implications for drilling operators and rig owners. DNV GL has now

Ship Repair & Conversion

Report: Ports Lack Maintenance Support

The latest Barometer Report from Trelleborg has revealed a huge gap in the maintenance requirements of port owners and operators, and the support that suppliers are able to provide.

Industry Partnership to Enhance BOP Maintenance

The maintenance of blowout preventers (BOPs) has significant financial, logistical and safety implications for drilling operators and rig owners. DNV GL has now

US Aircraft Carrier 'Ike' Leaves Drydock

The aircraft carrier USS Dwight D. Eisenhower (CVN 69) (Ike) has left dry dock and moved from Dry Dock 8 to pier 42/43 at Norfolk Naval Shipyard (NNSY) in Portsmouth, Va.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1421 sec (7 req/sec)