A&P Tyne Gets MoD Contract

Tuesday, February 19, 2002
The U.K. Ministry of Defence (MoD) Warship Support Agency (WSA) has awarded the dry dock and repair contract of the Royal Fleet Auxiliary (RFA) Fort Victoria to A&P Tyne at Wallsend. The multi million pound contract is excellent news for the local community as it will provide work for up to 500 men including subcontractors during March, April and May (2002) in the Wallsend yard. The work includes hull preparation and painting, main engine overhaul, repairs to deck machinery and Replenishment at Sea (RAS) equipment, electrical work and an extensive alterations and additions package. The Fort Victoria is one of the most complex vessels operated by the RFA. The 17,000dwt vessel is 203.9m in length and 30m in beam and was built in 1990 at Belfast's Harland & Wolff. The vessel is classed by the Ministry of Defence as an Auxiliary Oiler Replenishment (AOR) vessel which carries fuel, ammunition, naval stores and food for front line vessels and is designed to support three helicopters and provide second line maintenance for frigate based helicopters.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Brent Holds Above $97, Eyes Worst Quarter Since 2012

Brent crude futures hovered above $97 a barrel on Tuesday, aided by firm U.S. and Chinese data, but the oil benchmark was on track for its deepest quarterly drop

MAN Propulsion Packages for New Icelandic Trawlers

MAN Diesel and Turbo inform that Icelandic owners, HB Grandi, Vinnslustodin hf. and Hradfrystihusid Gunnvör, have ordered newbuildings based on two different ship

IRPT, Community College MoA on Maritime Training

The Inland Rivers, Ports and Terminals (IRPT) Trade Association announced today that it has entered into a memorandum of understanding with Lewis & Clark Community

Tanker Trends

GTT Earns Five AIPs for Multi-gas Membranes

Gaztransport & Technigaz (GTT), designer of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announced five

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

GasLog Closes First Option Vessels Dropdown

GasLog Ltd.  announced today the closing of the sale of two modern liquefied natural gas (“LNG”) carriers, the Methane Jane Elizabeth and Methane Rita Andrea,

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1225 sec (8 req/sec)