ACP Requests Proposals for Pacific Entrance Dredging

Tuesday, September 11, 2007
The Panama Canal Authority (ACP) has released its request for proposal (RFP) for the Canal’s Pacific entrance dredging. Different from the dry excavation, this project will deepen and widen the Canal’s Pacific entrance channel to ensure that longer, wider ships can reach the new locks.

The scope of work will include the dredging of approximately 321 cubic ft. and will widen the 8.9 mile-long navigation channels at least 218 meters, deepening them to a maximum level of -15.5 meters Mean Low Water Springs (MLWS).Prior to the release of the Pacific entrance dredging RFP, on August 7 the Panamanian National Environmental Authority (ANAM) approved the environmental impact study (EIS) for the project. With this approval, the ACP can now move forward with the process to select a firm.

Bids for the Pacific entrance dredging are due January 28, 2008, and important dates in the process include a site visit September 19 and a discussion meeting September 20. The ACP will ultimately evaluate proposals that meet the project’s needs based on a combination of best value and individual consultations with bidding firms. Expansion will build a new lane of traffic along the Panama Canal through the construction of a new set of locks, which will double capacity and allow more traffic and longer, wider ships.

Email AddThis Feed Button Share
Maritime Reporter May 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

UK P&I Club Pocket Guide for Safe Carriage of Solid Bulk Cargoes

When bulk cargoes shift, liquefy, catch fire or explode as a consequence of poor loading procedures, the consequences can be massive. Ships may capsize, lose stability

Eco Marine & KEI System to Launch Aquarius MAS

Robust automation, control and management system for marine renewable energy solutions. Eco Marine Power (EMP) and KEI System Ltd (KEI) of Osaka, Japan, announced

Mustang Improves First Responder Water Rescue Kit

Mustang Survival’s First Responder Water Rescue Kit (MRK110) has been updated to include an M.I.T. 100 Inflatable PFD, replacing the belt pack inflatable. The M.

Dredging

IHC Merwede Delivers New Backhoe Dredger

IHC Merwede delivered the Alberto Alemán Zubieta to Autoridad del Canal de Panama (ACP) in Panama City. The formalities were handled by ACP’s Contracting Officer, Mrs.

MTR100: Subsea Industry Awards Deadline Approaching

The July / August 2013 edition of Marine Technology Reporter will once again feature the MTR100, profiles of 100 leading companies in the global subsea sector. This editorial feature is free,

Orion Announces $9 Million Contract

Orion Marine Group, Inc., a heavy civil marine contractor serving the infrastructure sector, announced a contract award of approximately $9 million. Orion Marine

 
 
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright