ACP Requests Proposals for Pacific Entrance Dredging

Tuesday, September 11, 2007
The Panama Canal Authority (ACP) has released its request for proposal (RFP) for the Canal’s Pacific entrance dredging. Different from the dry excavation, this project will deepen and widen the Canal’s Pacific entrance channel to ensure that longer, wider ships can reach the new locks.

The scope of work will include the dredging of approximately 321 cubic ft. and will widen the 8.9 mile-long navigation channels at least 218 meters, deepening them to a maximum level of -15.5 meters Mean Low Water Springs (MLWS).Prior to the release of the Pacific entrance dredging RFP, on August 7 the Panamanian National Environmental Authority (ANAM) approved the environmental impact study (EIS) for the project. With this approval, the ACP can now move forward with the process to select a firm.

Bids for the Pacific entrance dredging are due January 28, 2008, and important dates in the process include a site visit September 19 and a discussion meeting September 20. The ACP will ultimately evaluate proposals that meet the project’s needs based on a combination of best value and individual consultations with bidding firms. Expansion will build a new lane of traffic along the Panama Canal through the construction of a new set of locks, which will double capacity and allow more traffic and longer, wider ships.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

2 Damen Tugs for KOTUG’s European Harbor Towage

Damen Shipyards Group delivered two sister tugs ATD 2412 ‘ZP Bison’ and ‘ZP Bear’ to strengthen KOTUG’s European Harbour Towage. On April 8th 2015, the sister

Naming Ceremony of Evergreen's EVER LYRIC

Evergreen Group today held the naming ceremony for EVER LYRIC, the eighth of its L-type vessels built by CSBC Corporation in Taiwan. The ceremony took place

MacGregor's Pusnes bow loading systems for Suezmax Tankers

MacGregor, part of Cargotec, has secured contracts to supply Pusnes bow loading systems for three newbuild shuttle tankers intended for operations in Brazilian waters.

Dredging

China Reef Work Could Lead to New Exclusion Zone

China could eventually deploy radar and missile systems on outposts it is building in the South China Sea that could be used to enforce an exclusion zone over the disputed territory, the U.

WCI Praises Increased USACE Funding

WCI today praised the leadership of House Appropriations Committee Chairman Hal Rogers (R-KY) and Energy & Water Development (E&WD) Appropriations Subcommittee

Suez Canal Dredging to Complete in July

Egypt's Suez Canal Authority has confirmed its massive expansion of the Suez Canal is on schedule and that dredging will be completed in July.   According to a state government communiqué,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1718 sec (6 req/sec)