After Facelift Balder Leaves Rotterdam

Tuesday, December 18, 2001
After a facelift of $ 200 million at the Verolme Botlek shipyard at Rotterdam, Monday evening December 17th Balder headed for the Norwagian offshore port Stavanger. The facelift changed the former crane vessel into a pipelayer. Thanks to the gigantic pipelaying tower of 120 metres, the Balder is able to lay pipes on a depth of more than 2.000 metres. Its first assignment is situated in the Gulf of Mexico.
Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

More German Shipowners Look to Gibdock for Repairs

Gibdock remarks it has continued to see its stock rise amongst the German shipowner community over the past year. Indeed the Gibraltar ship repair yard’s recent

NZ Interislander Ferry to Dry-dock in Devonport

NewZealand's KiwiRail says that the Interislander ferry Arahura has left Wellington for her scheduled bi-annual dry-docking in Devonport, having last visited Auckland in July 2012.

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0772 sec (13 req/sec)