AIOC Awaits Go-Ahead on Caspian Oil Project

Wednesday, June 06, 2001
The BP-led Azerbaijan International Operating Company (AIOC) said on Wednesday it expected the Azeri government to give a green light in August for the next phase of its Caspian oil production project.

AIOC's president David Woodward told an oil and gas conference in the Azeri capital Baku the next phase aims to boost production to 350,000 barrels per day in 2005 from current levels of 100,000-130,000 bpd.

The project envisages bringing the Azeri field onstream in early 2005, adding to volumes from the Chirag field, which has been in production since 1997.

The cost of the expansion plans, called Phase One, is put at $3.3-3.4 billion, Woodward said. The next phase envisages the construction of a drilling platform for 48 wells, a gas compressing facility, an underwater pipeline from the Azeri field and modernization of an onshore oil terminal.

The new production levels would be reached just as a planned $2.8-2.9 billion pipeline from Baku across Georgia to Turkey's Mediterranean port of Ceyhan would be completed.

AIOC has already pumped more than 14 million tons of oil from Chirag since 1997, exporting oil through a pipeline to Supsa on Georgia's Black Sea coast.

The whole project is aimed at production at three offshore Caspian fields - Chirag, Azeri and deepwater of Guneshli.

AIOC, which unites BP; Unocal; Azeri state oil company SOCAR; Russia's LUKOIL; Statoil; Exxon Mobil; TPAO of Turkey; Devon Energy, Itochu; and Delta Hess, expects production from the offshore complex to reach 1.0-1.3 million bpd between 2008 and 2010.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

British Queen to Name New Ship

Queen Elizabeth II will christen P&O Cruises’ new flagship Britannia in Southampton, England, on March 10. She will be accompanied by her husband, Prince Philip, the Duke of Edinburgh.

Zamakona Yards' Commitment to Well-being

Recently employees of Zamakona Yards participated in a training course for maintaining Health, Safety and Environment (HSE). The theoretical practice focused on working at heights,

GasLog Post 4Q 2014 Results

GasLog Ltd. and its subsidiaries an international owner, operator and manager of liquefied natural gas carriers, today reported its unaudited financial results for the quarter ended December 31,

Offshore

Hercules Offshore Shares Fall 33%

Drilling contractor Hercules Offshore Inc's shares fell as much as 33 percent to a record low on Friday, a day after Deutsche Bank cut its price target on the company's stock to $0.

Brightoil Reports Steady Growth in Interim Results

Brightoil Petroleum (Holdings) Limited announced its interim results for the six months ended December 31, 2014, reporting steady growth over the period.   During the period,

Mexico Approves 5 Shallow Water Areas in Round One Oil Tender

Mexico has approved the terms for five shallow water areas containing around 355 million barrels of oil equivalent as part of its Round One tender to open up the country's oil fields,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2891 sec (3 req/sec)