Air Cavity System for Existing Vessels

Tuesday, March 09, 2010
Photo courtesy Blue Communication

DK Group announced the launch of the Air Cavity System (ACS) Retrofit for existing vessels.  The new technology - a development of the original ACS that was specifically designed for new vessels - can be retrofitted at standard drydock or in most ship and repair yards in just 14 days.

ACS Retrofit, which seatrials have shown can reduce fuel consumption by up to 15% depending on vessel type, has an average fuel cost payback of under two years at current bunker fuel prices, with some ship classes achieving substantially better payback periods. Through continual research and development, Jorn Winkler and his team have also reduced the size and length of the cavity of the ACS system by 90% since it was first developed.  

DK Group has also announced the appointment of Ken Bloch Soerensen as chief executive officer. Soerensen was previously chief executive of United Arab Shipping Company (UASC), executive director of the European Liner Affairs Association, senior vice president of NOL Group, and spent 18 years working with A.P. Moller - Maersk.

ACS can be installed on existing and newbuild vessels for many classes of vessels in the ocean-going commercial fleet, including: tanker vessels, containerships, bulk carriers, general cargo ships and LNG/LPG vessels. ACS will continue to be offered to shipowners building new vessels in tandem with ACS for existing vessels.
 

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

BMT Partners with Aage Hempel

BMT SMART (BMT),  has announced  that Aage Hempel has become an accredited service partner.  This agreement will provide both organizations with the opportunity

SeaZip Takes Delivery of Damen Crew Suppliers

On 28 March, SeaZip Offshore Service named two new Damen Fast Crew Suppliers (FCS) 2610 at Damen Shipyards Gorinchem.   The two vessels, named SeaZip 3 and SeaZip 4,

Damen Delivers Stan Patrol Vessel to RBDF

The Royal Bahamas Defence Force (RBDF) has taken delivery of the fourth and final Stan Patrol 4207, named HMBS Rolly Gray. The four Stan Patrol 4207s form part of the six-year Sandy Bottom project.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4267 sec (2 req/sec)