Aker Kvaerner Secures Contract from BP

Monday, January 31, 2005
AK Engineering Services, part of the Aker Kvaerner group, has secured a multi-million pound contract to service two major onshore facilities for BP in the UK. The work will be performed by personnel from the firm's Stockton facility and from sister organisations in Aberdeen and Solent over the next three years. The scope of work covers the provision of engineering, modifications and maintenance services at BP's Wytch Farm production and transport facility in Dorset, and at the BP CATS (Central Area Transmission System) gas terminal on Teesside, North East England. The contract includes three further two-year extension options. Around 150 personnel from the three locations will be employed on the project. The new contract is the second to be awarded by BP to the Aker Kvaerner group in recent weeks. The first involves engineering, procurement services and construction management services for projects at several BP sites in Germany, work that is being carried out by Aker Kvaerner's European operations. Jarle Tautra, Executive Vice President for the firm's European E&C business area, says the latest contract is cause for great celebration: "We are delighted to be working with BP in the UK, which will enable us to consolidate the relationship we are building with BP in Germany. This project represents a major opportunity for the teams at our various locations to create a flagship contract that will deliver total life-cycle engineering services to both the CATS and Wytch Farm facilities." In operation since 1993, the CATS terminal receives and processes natural gas from the central UK Sector in the North Sea via a 400-kilometre pipeline system, which, in 2002, transported 1.7 billion cubic feet of gas a day to Teesside. The Wytch Farm development has been producing oil and gas since 1979. The oilfield lies a mile beneath the surface of Poole Harbour in Dorset, on the south coast of England, a designated Area of Outstanding Natural Beauty. The field is being developed by extended reach drilling from an onshore site, concealed from public view, to ensure minimum impact on the environment.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

USCG: Body Found in Search for Ship Sunk in Hurricane

The U.S. Coast Guard on Monday said its crews had found a body and an empty, heavily damaged lifeboat in their search for the cargo ship El Faro, believed to have

Kalmar to Upgrade MSC Terminal VLC (Valencia) Cranes

Kalmar, part of Cargotec, has announced a large contract to heighten and extend the handling capabilities of eight ship-to-shore (STS) cranes at MSC Terminal VLC in Valencia, Spain.

Wärtsilä Debuts Package for hydropower & industrial plant

Wärtsilä Corporation, a global leader in complete lifecycle power solutions for the marine and energy markets, expands into a new market segment, offering a comprehensive package of seals,


Kruszewski Joins Braemar Engineering

Braemar Engineering, the specialist maritime engineering consultancy, today announced the appointment of Chis Kruszewski to the role of Senior Electrical Engineer in its Offshore,

RigNet Partners Inmarsat to Offer Fleet Xpress

RigNet, Inc., a global provider of remote managed offshore communications solutions, telecoms systems integration services and collaborative applications to the oil and gas industry,

Italy's Eni Arrives Arctic as Shell Departs

As Shell retreats from the Arctic, the Italian oil giant Eni is making final preparations for its own oil exploration venture in the Norwegian Arctic, reports the Guardian.

Maritime Security Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2276 sec (4 req/sec)