Aker Kvaerner Secures Contract from BP

Monday, January 31, 2005
AK Engineering Services, part of the Aker Kvaerner group, has secured a multi-million pound contract to service two major onshore facilities for BP in the UK. The work will be performed by personnel from the firm's Stockton facility and from sister organisations in Aberdeen and Solent over the next three years. The scope of work covers the provision of engineering, modifications and maintenance services at BP's Wytch Farm production and transport facility in Dorset, and at the BP CATS (Central Area Transmission System) gas terminal on Teesside, North East England. The contract includes three further two-year extension options. Around 150 personnel from the three locations will be employed on the project. The new contract is the second to be awarded by BP to the Aker Kvaerner group in recent weeks. The first involves engineering, procurement services and construction management services for projects at several BP sites in Germany, work that is being carried out by Aker Kvaerner's European operations. Jarle Tautra, Executive Vice President for the firm's European E&C business area, says the latest contract is cause for great celebration: "We are delighted to be working with BP in the UK, which will enable us to consolidate the relationship we are building with BP in Germany. This project represents a major opportunity for the teams at our various locations to create a flagship contract that will deliver total life-cycle engineering services to both the CATS and Wytch Farm facilities." In operation since 1993, the CATS terminal receives and processes natural gas from the central UK Sector in the North Sea via a 400-kilometre pipeline system, which, in 2002, transported 1.7 billion cubic feet of gas a day to Teesside. The Wytch Farm development has been producing oil and gas since 1979. The oilfield lies a mile beneath the surface of Poole Harbour in Dorset, on the south coast of England, a designated Area of Outstanding Natural Beauty. The field is being developed by extended reach drilling from an onshore site, concealed from public view, to ensure minimum impact on the environment.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Danos Fabrication Facility Creates 150 Jobs

Danos, a family owned oil and gas service company, announced plans to expand its fabrication capabilities, by opening a 120,000 square-foot fabrication facility in Amelia, La.

US’ Largest Floating Drydock Heads to Portland

The country’s largest floating drydock, the Vigorous, is headed for Portland this weekend. The drydock, a piece of equipment used to lift vessels as large as cruise ships out of the water,

Transocean Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts and changes in estimated planned out-of-service

Offshore

Transocean Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts and changes in estimated planned out-of-service

Eaton to Exhibit at SMM

Power management company Eaton will demonstrate its expanded ability to deliver electrical, explosion-proof and hydraulic equipment for the marine and offshore

Coast Guard Medevacs Seafarer From Tanker off Galveston

A Coast Guard rescue helicopter crew medevaced a 32-year-old crewmember off an Italian-flagged tanker Wednesday, after he suffered an injury from a snapped fender

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1551 sec (6 req/sec)