Aker Solutions' Drilling Rig Hull Sails Away from Dubai to Stord

Wednesday, April 16, 2008

The hull substructure for the world's most advanced drilling rig Aker H-6e has started on its 50 days journey from to Stord in .  Weighing 16 000 tonnes, equalling 16 000 cars, this is one of the largest drilling rigs to be towed.  The hull is constructed by Aker Solutions at Drydocks World's yard and will be towed to Aker Solutions' yard at Stord, situated on the west coast of . There it will be assembled with the topside facility and subject to further construction work prior to delivery.
The 120 meter long hull will be towed through the Suez Canal into the Mediterranean Sea, passing the western coasts of and , entering the before it reaches its final destination at Stord on the Norwegian west coast late May/early June.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Update: LOOP Terminal Shutdown

LOOP's Offshore Marine Terminal suspended its crude oil offloading operations on August 13 while investigating an oil sheen discovered along the pipeline. According to the terminal,

GoM Sale Yields $110m in High Bids

As part of President Obama’s all-of-the-above energy strategy to continue to expand safe and responsible domestic energy production, today’s Western Gulf of Mexico Lease Sale 238 attracted $109,

Motion Compensation Aids Offshore Lifeboat Lift

In a refurbishment program to upgrade lifeboats on offshore platforms, Ampelmann completed a second successful reinstallation using its full motion compensation technology.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1061 sec (9 req/sec)