Aker Solutions Power Cable Installation Contract

Thursday, March 25, 2010

Aker Solution' marine operations unit has entered into a long-term agreement with ABB regarding installation of power cables and related services. ABB will charter one of Aker Solutions' new vessels for installation campaigns during 2012 and 2013. Aker Solutions estimates that this can generate revenues up to $82.3m. The agreement also includes options for further campaigns in the period 2014 - 2016. Key deliverables from Aker Soutions will in addition to the vessel include project management, engineering and offshore execution. The vessel is a state-of-the-art installation vessel uniquely equipped to install long, heavy power cables and subsea umbilicals.  It is one of Aker Solutions' vessels already under construction. The vessel will be called Aker Connector and will be ready for operations from 2012.
 
For Aker Solutions the agreement means higher predictability with regards to vessel utilisation and associated operations such as engineering, installation planning and execution of the installation activities. ABB and Aker Solutions have also entered into a strategic cooperation agreement where the two parties have ambitions to combine their strengths within power cables (ABB) and installation services (Aker Solutions) in selected projects. Aker Solutions' contract party is Aker Marine Contractors AS. 

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Topaz Responder Saves Refugee Migrants

Topaz Energy and Marine has emerged as an unlikely player in the effort to save refugee migrants risking their lives on the sea crossing from Turkey to Greece’s islands in order to reach Europe.

Globus Maritime Reclassifies Board Member

Globus Maritime Limited, a dry bulk shipping company, announced today that when Georgios Karageorgiou, a Class I director of Globus Maritime Limited  resigned on December 28,

First Panama Canal Water-Saving Basin Filled

The Panama Canal Authority (ACP) announced that the first water-saving basin of the Agua Clara Locks’ upper chamber has been filled to the required level in order

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0528 sec (19 req/sec)