Aker Yards to Build Ferries for P&O

Monday, August 11, 2008

Aker Yards and P&O Ferries have signed a contract for building two car-passenger ferries for the Dover-Calais service. The total contract price for both vessels is approximately EUR 360 million. The vessels are scheduled for delivery in 2010 and 2011 respectively.  The contract includes options on a further two vessels of the samedesign.The vessels will be built in Aker Yards, Rauma.

Becoming the largest ferry in the means a 49,000 GT vessel with the length of 210 metres and having 2,700 lane metres of vehicle space.  There will be space for more than 180 freight vehicles and additionally for up to 195 tourist vehicles. The vessels will be capable of carrying up to 2,000 passengers.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

USCG in Search of Missing Man in Lake Michigan

The Coast Guard is searching for a man who went missing on Lake Michigan, Tuesday. Missing is 48-year-old Joseph Kiehm from Milwaukee. Kiehm was last seen aboard his 26-foot white sailboat,

TRIYARDS' Liftboat Orderbook Filling up

*This new order brings total liftboat contracts to date to 14, and showcases TRIYARDS’ engineering versatility * Win affirms TRIYARDS' leadership position as

Robert Allen Designed Tug Launched in Italy

Rimorchiatori Riuniti bolsters Porto di Genova fleet with another Robert Allan Ltd. designed tug Rimorchiatori Riuniti currently operates five Robert Allan Ltd.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2275 sec (4 req/sec)