Aker Yards to Build Ferries for P&O

Monday, August 11, 2008

Aker Yards and P&O Ferries have signed a contract for building two car-passenger ferries for the Dover-Calais service. The total contract price for both vessels is approximately EUR 360 million. The vessels are scheduled for delivery in 2010 and 2011 respectively.  The contract includes options on a further two vessels of the samedesign.The vessels will be built in Aker Yards, Rauma.

Becoming the largest ferry in the means a 49,000 GT vessel with the length of 210 metres and having 2,700 lane metres of vehicle space.  There will be space for more than 180 freight vehicles and additionally for up to 195 tourist vehicles. The vessels will be capable of carrying up to 2,000 passengers.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Aberdeen Pupils Peek into Subsea Oil & Gas Technology

Pupils at an Aberdeen primary school were given a rare insight into the depths of the oil and gas industry’s subsea sector after getting to sit in the driving

AVEVA, DNV GL's Sesam Integration Cuts Cost

Integration of Aveva and DNV GL's Sesam Reduces Costs in Maritime and Offshore Engineering. Engineers designing ship hulls and offshore floaters can now save

Bestobell Bags HHI's Valve Order

Bestobell Marine, a world leading supplier of cryogenic valves for ships, has won a major new order from Hyundai Heavy Industries (HHI) in South Korea to supply valves for two new vessels.

 
 
Maritime Contracts Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0853 sec (12 req/sec)