Alaskan Ferry Sustains Damage

Tuesday, December 21, 2004
The Alaska Marine Highway System (AMHS) is cooperating with U.S. Coast Guard Marine Safety Office Juneau to investigate and evaluate structural damage sustained to the ferry Fairweather Thursday (December 16) in Southeast Alaska waters.

Fairweather sustained damage by waves during a regularly scheduled voyage from Haines to Juneau late Thursday afternoon.

The vessel carried 101 passengers at the time, including the commanding officer of Marine Safety Office Juneau. At no time during the voyage were the passengers in any danger. Crewmembers discovered the damage after the Fairweather safely docked in Juneau upon completion of the voyage. Damage appears confined to a void space located at the forward part of the vessel between the two catamaran hulls. Several of the internal structural frames also suffered damage along with an 18-inch tear in the vessel's hull plating. All damage is about 14 feet above the waterline.

Coast Guard marine inspectors examined the damage and are prohibiting the ship from carrying passengers or vehicles until satisfactory repairs are completed.

A Coast Guard investigation is underway to determine the cause of the casualty. The vessel's master reduced speed during the voyage and crewmembers took steps to ensure the safety of the passengers.

The Coast Guard will remain engaged throughout the repair process and will review and approve all repair proposals. One of Coast Guard Marine Safety Office Juneau's many missions is to inspect commercial vessel's plying U.S. waters to ensure they are safely maintained to prevent vessel casualties.

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

MN 100: ContainerTug B.V.

The Company: ContainerTug B.V. is a specialized Dutch naval design engineering and construction company with a strong focus on developing workboats and the evaluation

Oman Drydock Company Expands Rapidly

Oman Drydock Company (ODC) is growing fast. In January, the yard hit an important milestone - its 300th drydocking. Harnessing the power of its new $1.8 billion, 1.

NASSCO Invests in Facilities, Equipment and People

General Dynamics NASSCO has invested several hundred million in capital projects as part of its efforts to increase efficiencies via  modular shipbuilding, including:

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.5228 sec (2 req/sec)