Aries Maritime Secures Charters for Two Products Tankers

Thursday, October 02, 2008

Aries Maritime Transport Limited announced that it has reached an agreement to commence a period charter for the , a 1992-built products tanker, and the High Rider, a 1991-built products tanker, with IPG for 12 months at a net rate of $18,525 per day per vessel. The period charter for the commenced on September 29, 2008 and the period charter for the High Rider is expected to commence upon completion of the vessel's current voyage charter on or about October 8, 2008.

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

GasLog Closes First Option Vessels Dropdown

GasLog Ltd.  announced today the closing of the sale of two modern liquefied natural gas (“LNG”) carriers, the Methane Jane Elizabeth and Methane Rita Andrea,

Cove Point LNG Export Facility Gets US FERC Approval

U.S. federal regulators on Monday approved construction of Dominion Resources Inc's liquefied natural gas export project in Cove Point, Maryland. Cove Point is the fourth U.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1402 sec (7 req/sec)