Aries Maritime Takes Delivery of Tanker

Monday, June 19, 2006
Aries Maritime Transport Limited announced it has taken delivery of the second of two new products tankers it acquired from the Stena Group. Upon delivery, the 72,750 dwt 2006-built double-hulled Panamax products tanker entered into a 2.5 year bareboat charter agreement with the Stena Group at a rate of $18,700 per day, which is equivalent to a time charter rate of approximately $24,500 per day. In addition, the bareboat charter with the Stena Group has a profit sharing component with a 30 percent share for Aries.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

$55M Berth Upgrade in Townsville Port

Townsville contractor CivilPlus Constructions has been awarded the design and construct tender for the primary wharf works component of Port of Townsville’s $55 million Berth 4 Upgrade project.

Aker Joins Johan Sverdrup Phase 2 Study

Aker Solutions will deliver a concept study on a new processing platform for future phases of the Statoil-operated Johan Sverdrup North Sea field, Norway's largest oil find in three decades.

GTT, DSME Ink Cooperation Deal

GTT, the world leader in the design of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announces the signature

 
 
Maritime Careers / Shipboard Positions Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0636 sec (16 req/sec)