Aries Maritime Takes Delivery of Tanker

Monday, June 19, 2006
Aries Maritime Transport Limited announced it has taken delivery of the second of two new products tankers it acquired from the Stena Group. Upon delivery, the 72,750 dwt 2006-built double-hulled Panamax products tanker entered into a 2.5 year bareboat charter agreement with the Stena Group at a rate of $18,700 per day, which is equivalent to a time charter rate of approximately $24,500 per day. In addition, the bareboat charter with the Stena Group has a profit sharing component with a 30 percent share for Aries.
Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

VT Halter to Build Bouchard ATB Tugs

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), today announced new contracts to build two 130-foot Articulated Tug Barge

Del Mar Signs Agency Agreement with Ciramar

Del Mar Marine Corp. announced it has signed an agency agreement with Ciramar Shipyards allowing the company to promote Ciramar Shipyard´s docking and facilities

Great Lakes Shipyard Wins EPA Drydock Contract

Great Lakes Shipyard has been awarded a contract for the United States Environmental Protection Agency (EPA) vessel R/V Lake Explorer II. The scope of work will include drydocking,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1128 sec (9 req/sec)