Austal USA Announces New CEO

Monday, May 19, 2003
Austal has appointed Greg Metcalf to the position of CEO. Prior to relocating to Mobile with his family, Metcalf worked for Austal Limited in Henderson, Western Australia for 5 years as Austal Group Financial controller and then Vice President of Business Development. Current activity at the Mobile yard includes a 143 –ft. high speed passenger catamaran being built for the Circle Line Statue of Liberty Ferry Company in New York City. Circle Line transports thousands of passengers each day to the Statue of Liberty and Ellis Island. The new catamaran is designed to meet Circle Line’s requirements for a vessel capable of fulfilling a number of different roles and will be delivered to New York in July.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Danos Fabrication Facility Creates 150 Jobs

Danos, a family owned oil and gas service company, announced plans to expand its fabrication capabilities, by opening a 120,000 square-foot fabrication facility in Amelia, La.

US’ Largest Floating Drydock Heads to Portland

The country’s largest floating drydock, the Vigorous, is headed for Portland this weekend. The drydock, a piece of equipment used to lift vessels as large as cruise ships out of the water,

Transocean Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts and changes in estimated planned out-of-service

Contracts

Transocean Fleet Update Summary

Transocean Ltd. today issued a monthly fleet update summary which includes new contracts, changes to existing contracts and changes in estimated planned out-of-service

Ecuador Coastguard Orders Damen Patrol Boats

Damen announced it has recently signed a contract with AstillerosNavalesEcuatorianos (Astinave) to construct two Damen Stan Patrols (Spa) 5009 for the Ecuadorian Coastguard.

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

 
 
Maritime Careers / Shipboard Positions Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1893 sec (5 req/sec)