Awilco Awarded Additional Option at Yantai Raffles

Tuesday, September 11, 2007
Awilco Offshore ASA (AWO) has been awarded an option to build a possible fifth semi submersible drilling rig at Yantai Raffles Shipyard. The option can be exercised until end December 2008, and would have a building period of 33 months from exercise. The additional option has been awarded AWO as part of an agreement with the yard to reschedule the delivery of the first rig, WilPioneer with 3 months to October 2008. AWO announced in the second quarter report that such a 3 months longer building period was expected.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Wärtsilä Integrated Solutions for Maersk's AHTS Vessels

A new series of six Anchor Handling Tug Supply vessels to be built at the Kleven Verft AS in Norway for the Danish based Maersk Supply Service A/S - part of the A.

Fourth Rig Delivered to Perforadora Central

Keppel AmFELS LLC, a wholly owned US subsidiary of Keppel Offshore & Marine Ltd (Keppel O&M), has delivered the jackup rig, Coatzacoalcos, to Mexico’s Central Panuco S.

Woodside to Pick up Moroccan Acreage

Woodside advises that it has entered into a contract for an exclusive Reconnaissance Licence (RL) with the Office National des Hydrocarbures et des Mines, the

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1179 sec (8 req/sec)