BAE Systems Wins $19m Contract

Friday, October 05, 2007
BAE Systems has won a $19 million contract from the U.S. Navy’s Southwest Regional Maintenance Center to refurbish and upgrade the ARCO (ARDM-5) floating drydock so it can service the Navy’s new Virginia-class nuclear-powered fast attack submarines. The company will perform drydocking and pierside work on the ARCO at both Naval Base Point Loma and BAE Systems San Diego Ship Repair. Work on the ARCO includes painting the drydock’s underwater hull, sides and tanks, reinforcing structural bulkheads, replacing and renewing switchboards, and upgrading the automated docking and centering system. All work is scheduled for completion in June 2008. The ARCO measures 492 feet long, 98 feet wide, and has a lifting capacity of 7,800 long tons. “This new submarine class requires enhanced maintenance capabilities,” said Al Krekich, president, BAE Systems Ship Repair. “When the upgrades are complete, the ARCO will be able to drydock Virginia-class vessels, and advances in automation will ensure the dockings can take place with fewer people.” With improved stealthiness, surveillance and special warfare enhancements and an emphasis on littoral warfare operations, the Virginia-class (SSN 774) fast attack submarines can excel in a wide range of warfighting missions: including anti-submarine and surface ship warfare; special operations; strike; intelligence, surveillance, and reconnaissance; carrier and expeditionary strike group support; and mine warfare.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

New Survey Vessel Ordered for the Port of London

The Port of London Authority (PLA) has ordered a new purpose-built survey catamaran, a CTruk MPC19, due to enter service on the river Thames later this year.   The

NAO Secures PSV Contracts with Oil Major

Nordic American Offshore Ltd. (NAO) informs that it has secured platform supply vessel (PSV) contracts with a major oil company.   NAO’s two new contracts with are for four months firm periods,

Maritime Security

NASSCO to Christen Third MLP, Lewis B. Puller

Shipbuilder General Dynamics National Steel & Shipbuilding Co. – NASSCO – will christen the USNS Lewis B. Puller (MLP 3 AFSB) Saturday, February 7, 2015 in San Diego.

BP Quits Indonesian Blocks on Risk Concerns

UK-listed energy giant BP has decided to relinquish two exploration blocks to Indonesia, after a survey of the blocks found them to be high risk, the company said on Friday.

Yemen Lifts Force Majeure on LNG Deliveries

Yemen on Friday lifted force majeure on liquefied natural gas (LNG) deliveries from its Balhaf plant, trading sources with knowledge of the matter said. Reuters reported last week that the 6.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Salvage Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1040 sec (10 req/sec)