Bayport Container Terminal Grand Opening

Friday, February 09, 2007
About 800 elected officials, port commissioners, community leaders, labor leaders and representatives of the maritime industry turned out on February 8 to watch the arrival of a new era in the containerized cargo market. The Berth of Bayport Container and Cruise Terminal provided the 800 guests the opportunity to witness the opening phase of the most technologically advanced container terminal on the U.S. Gulf Coast.

The Port of Houston Authority dominates the U.S. Gulf Coast containerized cargo market. Currently, PHA handles 64 percent of that market along the U.S. Gulf, and 94 percent of the waterborne containers moving through Texas. Most of that activity takes place at PHA's companion container terminal at Barbours Cut. The Barbours Cut terminal was built in the 1970s and is operating above designed capacity.

Container throughput at Houston's port has risen at an average growth rate of more than 10 percent per year for the last 15 years. Studies conducted by the Texas Transportation Institute predict a continued worldwide container growth rate of 7.2 percent through 2010. The study also estimates annual growth rates as high as 13 percent along the Gulf of Mexico. Conservative projections suggest Bayport will have a profound impact on the local economy. After five years of operation, the combined container and cruise terminal is projected to generate 9,825 jobs, $395.4 million in personal income, $1.1 billion in business revenue and $35.6 million in state and local taxes. At full build-out of the facility in 15 or more years, 32,163 jobs, $1.4 billion in personal income, $2.4 billion in business revenues and $128 million in state and local taxes will be produced from Bayport's operations. Roger Guenther, PHA General Manager of Container Terminals, will manage Bayport. CMA CGM, the world's third largest shipping company, is the first customer at Bayport and will be joined by Mediterranean Shipping Company as the only two steamship lines calling at Bayport for the foreseeable future.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

5th Floating Accommodation for Lerwick

A further accommodation ship, Ocean Atlantic, is due at Lerwick on Monday 27 April 2015 and is on its way from Portland in Dorset. As with the other floating accommodation at the port,

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

APM Maasvlakte II Terminal Opens

APM Terminals Maasvlakte II held a ceremony  to celebrate the opening of the world’s most automated container terminal.   The  event that was attended by Dutch

Crewboats

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

‘Row around Singapore Island’ Takes off today

The epic endurance challenge that will see 32 volunteers rowing 140km non-stop around Singapore is starting in less than 24 hours. The project has raised a staggering $450,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1540 sec (6 req/sec)