Bender Gets Contract on USS Ticonderoga

Friday, January 25, 2002
Senator Jeff Sessions announced that Bender Shipbuilding & Repair Co., Inc. has been awarded a contract for the drydocking of the USS Ticonderoga, the Navy’s first Aegis Cruiser, presently homeported in Pascagoula, Miss. The vessel’s overhaul is being managed by the Supervisor of Shipbuilding, Conversion in Pascagoula, Miss. for the Department of the Navy. The repairs are scheduled to being in February 2002. The work package includes rudder, shafting, valve, structural and electrical repairs as well as major preservation items that presently total approximately $8 million; employing approximately 125 shipyard workers at the peak of the 120-day contract. Bender has the option pricing in place for additional work that could bring the total package to almost $16 million.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

JFD Wins Lifeboat Design Contract for Flash Tekk

JFD, part of James Fisher and Sons plc, announced that it has won a contract with Singaporean company Flash Tekk Engineering for the design and manufacture of up

First Damen Tug for Fratelli Neri

Fratelli Neri S.p.A has taken delivery of a Damen ASD Tug 3212. The new vessel, called Luisa Neri, was handed over from Damen Maaskant Shipyards Stellendam in the Netherlands, on 25 January 2016.

Wood Group Extends North Sea Chevron Contract

Wood Group has secured an extension to continue to support Chevron Upstream Europe across four offshore assets in the North Sea. Wood Group PSN (WGPSN) will deliver

Environmental

All Ships’ Ballast Water Checked in Great Lakes Seaway

Great Lakes Seaway Ballast Water Working Group releases 2015 ballast water management report    The Great Lakes Ballast Water Working Group (BWWG) released its

Tampa Bay Pilots Suspend Operations

Gale force winds and high sea conditions offshore making it unsafe for pilots to board have led the Tampa Bay Pilots to suspend all inbound and outbound vessel traffic as of about 5:20 a.

The Mississippi River and the 2016 Flood’s Impact on Dredging

The Mighty Mississippi River connects 31 states and 2 Canadian Provinces by a liquid superhighway that includes over 250 tributaries and features more miles of

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0795 sec (13 req/sec)