Bisso Marine Salvages Buried Crane

Tuesday, December 04, 2007
Bisso Marine recently mobilized a salvage team, the salvage support barge C/B BIG EAGLE and the 700 ton capacity D/B Cappy Bisso to salvage a crawler crane which had fallen into the Atchafalaya River in Berwick, La. The crane, which weighed approximately 100 tons, was knocked into the river upon contact with the HWY 90 Bridge in 2005. At the salvage location the water was 30 ft. deep, but in the two years since the collision, the crane had settled to approximately 25 feet below the river bottom. BISSO MARINE salvage divers used multiple airlifts up to 14 inches in diameter to excavate the crane which was found to be down by the counterweight. By accessing the hoist drums and the crane carbody, divers were able to connect lifting slings to the crane. The D/B Cappy Bisso applied 120 tons of force to ease the crane out of the mud as airlifting operations continued to move large amounts of muddy river bottom. Upon removing the crane from the mud hole, it was lifted through the water column and placed on to the deck of a barge for delivery. Once the crane was secured on to the deck of a barge, the Bisso Marine salvage divers returned to the river bottom to locate the 180 feet of damaged boom which was also buried in the mud. Again using the airlifts, the salvage divers were able to expose the buried boom and remove it using the Manitowoc 4000 on board the salvage support crane barge C/B Big Eagle. Due to the crane being in the middle of the navigable waterway, all marine traffic had to be stopped during the salvage operation to allow for safe diving operations. To mitigate to impact of the waterway closure, Bisso Marine conducted 24 hour continuous operations. The entire excavation and salvage operation was completed in 10 working days.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Wärtsilä Expects 5% Sales Growth

Wärtsilä announced its third quarter results, reporting that it sees good development in order intake and profitability. According to Wärtsilä, third quarter

MacGregor Reorganizes into 7 Operative Divisions

MacGregor, part of Cargotec, announces changes in its operative structure and starts a reorganization into seven operative divisions which will become effective on January 1, 2015.

Iridium Partners with Trimble to Support Expansion

Iridium Communications Inc. announced an agreement with Trimble that expands the company's use of satellite communications in its core Transportation and Logistics

Salvage

Documentary Examines Shipbreaking Practices in Bangladesh

Toxic ships for Bangladesh: TV documentary on German ship owners and their shipbreaking practices A new documentary titled "Giftiger Tankerschrott für Bangladesch

Boater Rescued from Sailboat Blaze

The U.S. Coast Guard assisted with the rescue of a boater Monday after the man's 33-foot sailboat caught fire five miles west of Windmill Point in the Chesapeake Bay.

WWII Wrecks Found 30 Miles off US Coast

The wreck of a World War Two German U-boat and a freighter that sank 72 years ago have been discovered off the North Carolina coast by U.S. researchers, officials said.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1235 sec (8 req/sec)