Blount/Barker Pens Contract For Marine Tug

Wednesday, March 14, 2001
Blount/Barker Shipbuilding signed a contract with Buchanan Marine, New Haven, Conn., for the construction of an 85 ft. (25.9 m), 2,400 hp all welded, Twin Screw tug.

Powered by twin CAT 3512 engines, twin disc gears and two 65 kW generators, the tug's hull and superstructure plans have been contracted via Bristol Harbor Marine Design, which will utilize CAD/CNC technology for all lofting and cutting. The tug will be keel cooled and equipped with two, four-blade stainless steel propellers measuring 70-78-in., as well as two pushing winches and an Almond Johnson towing machine.

Used for harbor and ocean towing of bulk material barges, the tug is scheduled to commence construction in early April for a November completion.

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Canada to Aid Developing Nations Fight Climate Change

Canada will provide aid to developing countries to combat climate change, Prime Minister Justin Trudeau announced on Friday ahead of talks on global warming,

Sandra Weakens to Tropical Storm off Mexico's Coast

Hurricane Sandra weakened to a tropical storm on Friday and was expected to continue losing strength as it approached Mexico's Pacific coast, the U.S. National Hurricane Center (NHC) said.

Gates to Launch Mega Clean Tech Initiative

Microsoft co-founder Bill Gates will launch a multi-billion-dollar clean energy research and development initiative on Monday, the opening day of the U.N. climate change summit in Paris,


Extended Warranty from Yanmar for Sailboat Engines

Yanmar Marine International B.V. has introduced an extended 3 years’ period of YANMAR Limited Warranty for Sailboat Engine Models. This extended warranty of

Damen Marine Components Opens Jiangyin Plant

Damen Marine Components (DMC) is proud to announce the opening of its brand new facility in Jiangyin, China.Those present at the opening ceremony included CEO

Groundbreaking Ceremony for Seaspan's Vancouver Office

Seaspan hosted a groundbreaking ceremony today to announce it has officially started construction on a new head office in North Vancouver. The 7,800 square metre (84,

Maritime Contracts Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2370 sec (4 req/sec)