Blount Barker Signs Contract For South Ferry Vessel

Monday, November 12, 2001
Blount Barker Shipbuilding signed a contract with South Ferry of Shelter Island, N.Y. to build a 101-ft. double-ended ferryboat. The vessel designed by South Ferry and Dejong & Lebet, Inc. is being built to service the half-mile crossing of partially protected inland waters between Shelter Island and the South Fork of Long Island. The 101' x 39’ x 10’-5” ferryboat designed with one open deck and one side island for crew and passengers will be built to USCG Sub Chapter ‘T’ Rules and Regulations for 149 passengers. The ferryboat is scheduled for delivery in June 2002.

The all-welded steel ferry to operate on protected inland waters will be powered by two 400hp Detroit Diesel Series, Six Cylinder DDEC Main Propulsion Engines with Twin Disc MG-516 gears (4.5:1). The vessel will be equipped with two 54" x 40” right hand Bird Johnson, Ice Class, four-blade propellers.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Sekimizu Welcomes Shipper’s Revised Stance on Ballast Water

IMO Secretary-General Koji Sekimizu has welcomed the reconsideration by the International Chamber of Shipping (ICS) of its position towards the ratification by

EXMAR Orders Second FLNG from Wison

EXMAR NV has placed an order for a second Floating LNG Liquefaction Unit (FLNG) at Wison Offshore & Marine. Under the agreement, Wison will be responsible for the turnkey engineering,

Marseille Fos Unveils Multimillion Growth Strategy

The Marseille Fos port authority has set out a vision for growth over the four years to 2018 in a strategic plan that puts developments costing $560 million at

Contracts

Teekay Petrojarl Contracts Damen for FPSO Upgrade

Damen Shiprepair Rotterdam (DSR), part of Damen Shiprepair & Conversion (DSC), has been awarded an EPC contract by Petrojarl I LLC for the upgrade of its FPSO Petrojarl I.

Contract Awarded for US Aircraft Carrier Dismantling

The U.S. Navy awarded a contract, Dec. 22, for the towing and dismantling of the decommissioned aircraft carrier Ranger (CV 61) to International Shipbreaking, Ltd.

EXMAR Orders Second FLNG from Wison

EXMAR NV has placed an order for a second Floating LNG Liquefaction Unit (FLNG) at Wison Offshore & Marine. Under the agreement, Wison will be responsible for the turnkey engineering,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1580 sec (6 req/sec)