Bollinger Contracted to Build Two for Bouchard

Thursday, February 17, 2005

Bouchard’s B.No. 225, sister hull to the announced newbuilds, B. No. 280 and B.No. 205, travels down the Mississippi River on her maiden voyage following delivery from Bollinger.

Bollinger Shipyards, Inc. of Lockport, Louisiana and Bouchard Coastwise Management, Corp., Hicksville, N.Y., one of the largest operators of double hull articulated tug/barge (ATB) units in the United States, signed a contract for Bollinger to build two double-hull, ocean-going barges that meet the requirements of the Oil Pollution Act of 1990 (OPA’90). These two additions will give Bouchard fourteen OPA’90 barges in their fleet. This addition to the Bollinger yards portfolio, will bring the delivered OPA’90 barge count to thirty-three when both units are delivered.

Following on the success of the recent Bollinger delivered ATB’s, 110,000 barrel B. No.225 with tug JANE A. BOUCHARD and delivery of the 145,000 barrel B. No.242 with the tug MORTON S. BOUCHARD IV, Bouchard has again teamed with Bollinger for their fleet expansion. B. No.280 will have a 80,000-barrel capacity and the B. No.205 will be able to carry 110,000 barrels. Delivery of the first barge is scheduled for November, 2005 and delivery of the second barge is planned for October, 2006. Terms of the contract were not disclosed.

Morton S. Bouchard III, president and chief executive officer of Bouchard Affiliates, said “We are pleased that Bouchard and Bollinger have come to an agreement to construct the first two vessels of Bouchard’s second phase construction program.”

The first new Bouchard barge, B. No.280 will be a clean oil barge measuring 399-feet long, with a 74-foot beam and a depth of 28-feet. The second barge, B. No.205 will be a black oil barge measuring 430-feet long, with a 79-foot beam and a depth of 34-feet. Their sterns will be built with a notch and vertical ladder structure as part of its Intercon coupler system.

“The Bollinger organization is pleased to be a part of Bouchard’s future plans.” said Donald “Boysie” Bollinger, chairman and chief executive officer of Bollinger Shipyards, Inc., “Our employees are dedicated to making the Bollinger built units the best in the industry.”

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Liquefaction Terminals to Dominate LNG Capital Expenditure

Capital expenditure (Capex) on global LNG facilities is expected to total $259 billion (bn) over the period 2015-2019, with investments expected to be 88% larger

Wärtsilä to Begin Building LNG Terminal in January

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

EGAS Tenders for as many as 48 LNG Cargoes

Egypt's state-owned gas company EGAS has tendered to buy at least 48 cargoes of liquefied natural gas (LNG) for delivery in 2015/16, three traders said. A senior

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1006 sec (10 req/sec)