Bollinger Delivers 100th Patrol Boat to Coast Guard

Thursday, November 20, 2003
Bollinger Shipyards, Inc., Lockport, La., and the United States Coast Guard celebrated a production and relationship milestone today with the delivery of Coastal Patrol Boat 52* SEA LION, WPB 87352, an 87-foot vessel of the Marine Protector Class, and the 100th patrol boat or cutter**, built by Bollinger for the Coast Guard. Bollinger has built the entire Coast Guard patrol boat fleet that includes 49, 110-foot Island Class and 51, 87-foot Marine Protector Class vessels. “We are extremely proud and deeply appreciative of our dedicated, skilled people who have accomplished this feat and all of the Coast Guard personnel who have worked with us as partners from the initial contracts as an effective team to help us achieve this significant accomplishment,” said Donald T. “Boysie” Bollinger, chairman and CEO of Bollinger Shipyards, Inc. We are proud to be one of the ‘…right partnerships with others’ as emphasized by Admiral Tom Collins, Commandant of the Coast Guard in his recent State of the Coast Guard address.” Bollinger Shipyards has served the Coast Guard since 1984 with the design and construction of the 110 foot ISLAND CLASS CUTTERS. The company began building a second class of cutters for the Coast Guard in 1996 when Bollinger won a contract to build the first Marine Protector Class cutter. Subsequent contracts and exercised options for Island Class and Marine Protector Class cutters have increased the total delivered to 100, with seven more under construction. In addition, Bollinger is the first contractor to initiate production in the Coast Guard’s massive $17 billion Deepwater program that will transform just about everything in the Coast Guard from facilities to jet aircraft. Working as a subcontractor to Northrop Grumman Ship Systems, Bollinger has begun the lengthening and modification of all 49 of the 110-foot Island Class cutters to 123-feet with enhanced capabilities in command, control, communications, computers, intelligence surveillance and reconnaissance (C4ISR). VT Halter will supply the superstructures or “houses.” In the future, Bollinger and VT Halter will build the replacements for the 123 cutters.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Reports: Brazilian Tycoon Batista Investigated For Financial Crimes

Brazils federal police have opened an investigation into former billionaire Eike Batista for financial crimes, including insider trading, manipulation of markets and money laundering,

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0900 sec (11 req/sec)