Bollinger To Build 3 Boats for Chouest

Tuesday, February 19, 2002
Bollinger Shipyards signed a contract for three 145 ft. supply/utility boats with Edison Chouest Offshore. "It's wonderful to again be building boats for the Chouest organization," said Donald "Boysie" Bollinger, chairman and CEO of Bollinger. Gary Chouest, president of Edison Chouest, said, "We look forward to building boats with a yard which has quality people, and products." Vessels will meet new regulatory standards and will be less than 100 GT (U. S. Reg.) and less than 500 GT (ITC) registered tonnage. Each vessel will measure 145 x 36 ft. with a maximum draft of 11.5-ft. Normal operating draft will be eight ft. A pair of Cummins KTA-38MO diesel engines rated 750 bhp at 1,600 rpm were selected to power the vessel, driving Bollinger 72 x 57 in., four-blade, stainless steel propellers through Twin Disc MG5301 reverse/reduction gears with a ratio of 4.96:1. The second and third vessels will be powered by two Caterpillar 3508B-diesel engines rated at 855 bhp at 1,600 rpm, driving 72 in., four blade NiBrAl propellers through Twin Disc MG 5301 reverse reduction gears with a ratio of 4.96:1. International Marine Systems Hydraulic steering will be installed at two pilothouse stations and a 272 hp Schottel, STT-110 bow thruster will aid steering on all three vessels. The engines feature a package that meets new IMO emission standards. The boats' electrical power will be provided by two Cummins 6CTA8.36 diesels driving two Cummins 99 KW generators with direct drive liquid mud pumps off of the generator engines thereby eliminating belt systems. Each of the new Chouest OSV's will be equipped with four liquid mud tanks and two Methanol tanks. Their large 95 x 32 ft. aft decks will be able to carry up to 390 long tons of cargo. Their crew/passenger decks will emphasize crew comfort with larger staterooms and living quarters with extra sound proofing and carpeting and 20 tons of Carrier air conditioning and 25kW heating. Delivery of the first vessel will be summer 2002 with the remaining vessels following in October and December 2002. Contract terms were not disclosed.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Bulk Carrier Trends

Baltic Sea Freight Index Falls to Lowest Level Since 1986

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, spiralled downwards to its lowest level in nearly three

Pacifica Rolls Out New Container Vessel

Pacifica Shipping, New Zealand's coastal shipping company, is launching a new container vessel from March replacing a smaller vessel whose charter has ended, reports The Stuff.

Shipping Pollution Will Skyrocket -Study

International freight volumes will grow fourfold by 2050 while the average length of haul will increase by 12 percent over that time, trends that will cause a spike

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0967 sec (10 req/sec)