Bollinger To Build 3 Boats for Chouest

Tuesday, February 19, 2002
Bollinger Shipyards signed a contract for three 145 ft. supply/utility boats with Edison Chouest Offshore. "It's wonderful to again be building boats for the Chouest organization," said Donald "Boysie" Bollinger, chairman and CEO of Bollinger. Gary Chouest, president of Edison Chouest, said, "We look forward to building boats with a yard which has quality people, and products." Vessels will meet new regulatory standards and will be less than 100 GT (U. S. Reg.) and less than 500 GT (ITC) registered tonnage. Each vessel will measure 145 x 36 ft. with a maximum draft of 11.5-ft. Normal operating draft will be eight ft. A pair of Cummins KTA-38MO diesel engines rated 750 bhp at 1,600 rpm were selected to power the vessel, driving Bollinger 72 x 57 in., four-blade, stainless steel propellers through Twin Disc MG5301 reverse/reduction gears with a ratio of 4.96:1. The second and third vessels will be powered by two Caterpillar 3508B-diesel engines rated at 855 bhp at 1,600 rpm, driving 72 in., four blade NiBrAl propellers through Twin Disc MG 5301 reverse reduction gears with a ratio of 4.96:1. International Marine Systems Hydraulic steering will be installed at two pilothouse stations and a 272 hp Schottel, STT-110 bow thruster will aid steering on all three vessels. The engines feature a package that meets new IMO emission standards. The boats' electrical power will be provided by two Cummins 6CTA8.36 diesels driving two Cummins 99 KW generators with direct drive liquid mud pumps off of the generator engines thereby eliminating belt systems. Each of the new Chouest OSV's will be equipped with four liquid mud tanks and two Methanol tanks. Their large 95 x 32 ft. aft decks will be able to carry up to 390 long tons of cargo. Their crew/passenger decks will emphasize crew comfort with larger staterooms and living quarters with extra sound proofing and carpeting and 20 tons of Carrier air conditioning and 25kW heating. Delivery of the first vessel will be summer 2002 with the remaining vessels following in October and December 2002. Contract terms were not disclosed.
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Bulk Carrier Trends

Japan Expresses Concern Over Chinese Ship Seizure

The Japanese government has expressed its concerns to China via diplomatic channels over the seizure of a Mitsui O.S.K. Line Ltd ship by a Chinese court in connection with a case over wartime claims,

Commodity Giant Steps out of the Shadows

A detailed new case study scrutinizing the risk-management Swiss-based Trafigura is the latest effort to "demystify" the once-secretive commodity trading industry,

Cargill to Buy 100,000mt of Certified Ivorian Cocoa

U.S. agribusiness trader Cargill aims to purchase 100,000 metric tons of certified Ivorian cocoa this season, up slightly from 95,000 metric tons last season, West

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1461 sec (7 req/sec)