Bollinger To Build 3 Boats for Chouest

Tuesday, February 19, 2002
Bollinger Shipyards signed a contract for three 145 ft. supply/utility boats with Edison Chouest Offshore. "It's wonderful to again be building boats for the Chouest organization," said Donald "Boysie" Bollinger, chairman and CEO of Bollinger. Gary Chouest, president of Edison Chouest, said, "We look forward to building boats with a yard which has quality people, and products." Vessels will meet new regulatory standards and will be less than 100 GT (U. S. Reg.) and less than 500 GT (ITC) registered tonnage. Each vessel will measure 145 x 36 ft. with a maximum draft of 11.5-ft. Normal operating draft will be eight ft. A pair of Cummins KTA-38MO diesel engines rated 750 bhp at 1,600 rpm were selected to power the vessel, driving Bollinger 72 x 57 in., four-blade, stainless steel propellers through Twin Disc MG5301 reverse/reduction gears with a ratio of 4.96:1. The second and third vessels will be powered by two Caterpillar 3508B-diesel engines rated at 855 bhp at 1,600 rpm, driving 72 in., four blade NiBrAl propellers through Twin Disc MG 5301 reverse reduction gears with a ratio of 4.96:1. International Marine Systems Hydraulic steering will be installed at two pilothouse stations and a 272 hp Schottel, STT-110 bow thruster will aid steering on all three vessels. The engines feature a package that meets new IMO emission standards. The boats' electrical power will be provided by two Cummins 6CTA8.36 diesels driving two Cummins 99 KW generators with direct drive liquid mud pumps off of the generator engines thereby eliminating belt systems. Each of the new Chouest OSV's will be equipped with four liquid mud tanks and two Methanol tanks. Their large 95 x 32 ft. aft decks will be able to carry up to 390 long tons of cargo. Their crew/passenger decks will emphasize crew comfort with larger staterooms and living quarters with extra sound proofing and carpeting and 20 tons of Carrier air conditioning and 25kW heating. Delivery of the first vessel will be summer 2002 with the remaining vessels following in October and December 2002. Contract terms were not disclosed.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Bulk Carrier Trends

Cargill: 50,000T of Sugar Affected by Brazil Fire

Approximately 50,000 tonnes of sugar were stored in a warehouse affected by fire in the Teag terminal in Brazil on Monday, Cargill Inc said in a statement. The terminal,

Simushir Under Tow by Barbara Foss

Foss Maritime's ocean-going tug, the Barbara Foss, is towing the Russian cargo vessel, Simushir, which lost power late Thursday night off the west coast of Haida Gwaii.

Vancouver Welcomes Bulker on Her Maiden Voyage

The Port of Vancouver USA welcomed the M/V Jobst Oldendorff, commanded by Capt. Baisie of Ghana, on her maiden voyage October 16. Capt. Baisie and his 21-member

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Electronics Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2478 sec (4 req/sec)