Bouygues Offshore Logs New Contract

Monday, December 10, 2001
Technigaz, a wholly-owned subsidiary of Bouygues Offshore, will build a Liquefied Natural Gas (LNG) tank in Palos de Frontera, Spain under a contract awarded by ENAGAS. This contract, for a total amount of EUR 40 million (Bouygues Offshore's share: EUR 28 million) will be performed by a Joint-Venture of Technigaz (70%) and Initec (30%). The customer, ENAGAS, is the only LNG importer in Spain so far. This turnkey contract covers Engineering, Procurement, Construction and pre-commissioning of a full-containment storage tank for the extension of the LNG import terminal located in Huelva harbor on the Atlantic Ocean. The inner tank will be made of 9% nickel steel with perlite insulation to maintain the LNG at a temperature of -163(degree)C, while the outer tank will be made of prestressed concrete. The full-containment tank has a storage capacity of 150,000m3. Delivery is scheduled for the end of the fourth quarter 2004.

Energy

Gasum, Wärtsilä Join Forces to develop Gas Value Chain

New joint co-operation between Gasum and Wärtsilä aims to develop the utilization and distribution of natural energy gases in marine and land markets. Gasum,

Worldscale Flat Rates to Fall Again

The concept of Worldscale is not an easy principle to grasp, particularly for those outside the tanker industry, says Weekly Tanker Market Report by Gibson.   The

Keppel to Deliver First North Sea FPSO

Keppel Offshore & Marine (Keppel O&M)'s wholly-owned subsidiary Keppel Shipyard Ltd (Keppel Shipyard) is on track to deliver a Floating Production Storage and Offloading

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0564 sec (18 req/sec)