BP Assessing Damage to Thunder Horse Platform

Tuesday, July 12, 2005
BP confirmed that the Thunder Horse semi-submersible platform, located in Mississippi Canyon Block 778 in the deepwater Gulf of Mexico, 150 miles southeast of New Orleans, is listing following the passing of Hurricane Dennis. Early reports confirmed that the platform is listing an estimated 20 - 30 degrees. The Thunder Horse field is in development and has not yet begun production of hydrocarbons. The situation was discovered at approximately 8:30 a.m. Monday morning by a vessel in the area. The cause is unknown. The Thunder Horse platform had been evacuated of all personnel on Friday in anticipation of the hurricane's approach. At this time there has been no known release of any fuel or hazardous substances. BP immediately activated its Incident Command structure, notified the appropriate regulatory agencies including the U.S. Minerals Management Service (MMS) and the U.S. Coast Guard, and conducted over flights to further assess the extent of the damage. At this time BP is mobilizing a number of response vessels to the Thunder Horse location and working with the Coast Guard to create a response plan. The first priority will be to safely board the vessel for a further assessment of its stability and to begin investigating potential causes of the issue. BP and the Coast Guard are collaborating to establish a Unified Command in Morgan City, Louisiana.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Pressure for Australia Sub Deal Grows

Australia to spend A$65 bln on ships and subs over 20 years; PM pledges A$40 bln for domestic shipbuilders. Australia will spend A$89 billion ($65 billion) on

Latest USCG Cutter At Boston Harbor

The Coast Guard’s latest 418-foot National Security Cutter James (WSML 754) entered Boston Harbor August 3, 2015. The James is the fifth of eight planned National

LNG Ferry Construction for Tallink Begins

The start of production of Tallink's new generation LNG powered fast ferry for the Tallinn-Helsinki route was celebrated on the 4th of August 2015 at Meyer Turku shipyard.

Offshore

CWind Joins National Workboat Association

Citing crew transfer services as an integral part of its offering, offshore wind industry service provider CWind announced it is now a member of the National Workboat Association (NWA) of the U.

BG Group Starts up Sixth FPSO in the Santos Basin

BG Group announced first oil from the Cidade de Itaguaí floating, production, storage and offloading (FPSO) vessel, the sixth unit to start production across the

BG Awards Fugro MBES, Seabed Coring Contract

Fugro has been awarded a contract by BG International Limited Sucursal Honduras to conduct an integrated multibeam echosounder (MBES) survey and seabed coring campaign

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1468 sec (7 req/sec)