C4ISR Powered Up on Waesche

Friday, October 03, 2008

The Lockheed Martin Coast Guard Systems team participated in the power up of the first set of electronic cabinets and consoles of the Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) system onboard the U.S. Coast Guard's second National Security Cutter, Waesche (WMSL 751).

Lockheed Martin's C4ISR systems will provide Waesche's crew with a common operating picture to aid coordination among helicopters, aircraft, other ships and shore facilities. The system has an open architecture design and provides interoperability, assuring that the Coast Guard can work with multiple federal, regional and state agencies and organizations to maintain maritime domain awareness and accomplish homeland security missions.

In this week's milestone, known as Electronics Light-Off, six operations center consoles, the large-screen display and the vessel's local area network electronics cabinets were powered up, marking the beginning of the National Security Cutter's electronics test program. Light-off of the communications suite cabinets was also accomplished. All 28 electronics cabinets, which constitute the core of the C4ISR system, will be powered up this week.

The 418-ft. Waesche, built at Northrop Grumman Shipbuilding's shipyard and equipped by Lockheed Martin with fully-integrated communications, sensors and electronic systems, will be the second ship in a class of technologically-advanced, multi-mission cutters. The first ship in this class, also equipped with Lockheed Martin's C4ISR system, USCGC Bertholf, was commissioned on August 4, in .

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

AkzoNobel’s Carbon Credits Methodology Wins Award

AkzoNobel’s landmark carbon credits methodology for the shipping industry has won the Best Offsetting Project award in the 2015 Voluntary Carbon Market Rankings.

GEORG FORSTER Calls Southampton for the First Time

The CMA CGM Group announced that the CMA CGM GEORG FORSTER called England for the first time on July 6th.    With its 1,305 ft. (398m) length and 177 ft. (54m) width,

Research Vessel Concept a first for Voith

The new fisheries research vessel of the Shanghai Ocean University will be a first for Voith in several respects.   It is the first fisheries research vessel

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1166 sec (9 req/sec)