C4ISR Powered Up on Waesche

Friday, October 03, 2008

The Lockheed Martin Coast Guard Systems team participated in the power up of the first set of electronic cabinets and consoles of the Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) system onboard the U.S. Coast Guard's second National Security Cutter, Waesche (WMSL 751).

Lockheed Martin's C4ISR systems will provide Waesche's crew with a common operating picture to aid coordination among helicopters, aircraft, other ships and shore facilities. The system has an open architecture design and provides interoperability, assuring that the Coast Guard can work with multiple federal, regional and state agencies and organizations to maintain maritime domain awareness and accomplish homeland security missions.

In this week's milestone, known as Electronics Light-Off, six operations center consoles, the large-screen display and the vessel's local area network electronics cabinets were powered up, marking the beginning of the National Security Cutter's electronics test program. Light-off of the communications suite cabinets was also accomplished. All 28 electronics cabinets, which constitute the core of the C4ISR system, will be powered up this week.

The 418-ft. Waesche, built at Northrop Grumman Shipbuilding's shipyard and equipped by Lockheed Martin with fully-integrated communications, sensors and electronic systems, will be the second ship in a class of technologically-advanced, multi-mission cutters. The first ship in this class, also equipped with Lockheed Martin's C4ISR system, USCGC Bertholf, was commissioned on August 4, in .

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Bodies found trapped in S Korean ferry

Divers searching for survivors of a capsized South Korean ferry saw three bodies floating through a window of a passenger cabin on Saturday but were unable to retrieve them,

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

Rotterdam port's throughput almost stable

The Port of Rotterdam’s throughput in the first quarter of 2014, at 109 million tonnes, was 0.2% below the level for the corresponding period last year.Split up by goods type,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1681 sec (6 req/sec)