Cable Snaps as Refloat Begins

Monday, July 02, 2007
One of the cables connecting the stranded freighter Pasha Bulker to a tugboat at Newcastle's Nobbys Beach has snapped, as efforts are made to refloat the freighter. The tugboat has now moved further out to sea. Two tugboats are still connected to the Pasha Bulker and their engines are working hard against the line. There are also three deep-sea anchors connected the Pasha Bulker and it is hoped that when the tide peaks, the ship will be able to refloat and move further out to sea. The bow of the ship is starting to move slightly as the ballast water continues to be pumped out, as waves lash the side of the hull. Source: ABC
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

Nordic American Offshore Declares Dividend

Nordic American Offshore Ltd. today announced that its board of directors has declared a dividend of $0.45 per common share for the third quarter 2014. This is the same as for the second quarter 2014.

GAO: Ending Crude Export Ban Could Ease 'Price at the Pump'

As the energy profile of the U.S. continues to improve and evolve daily, fresh debate in favor of exporting oil and gas products -- which would have a significant impact on the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1057 sec (9 req/sec)