Cameron LNG: Proposed Berthing Facility

Thursday, February 03, 2005
The Federal Energy Regulatory Commission (FERC) issued a Notice stating that it intends to prepare an environmental assessment of the proposed Cameron LNG berthing facility to be built in the vicinity of Hackberry, Louisiana. Comments on the proposal should be submitted by February 25. 70 Fed. Reg. 5435 (HK LAW)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

NAT Takes Delivery of Suezmax, Earnings Capacity Up

Nordic American Tankers Limited ("NAT" or "the Company") announced that it today took delivery of a Suezmax vessel, the Nordic Sirius, built at a shipyard in Japan.

BIMCO - Oil Product Tankers Earnings Decline as stockbuilding Slows Down

BIMCO’s expectations remain as the oil product tanker fleet continues to grow with earnings at the lowest since Q3 in 2014. But there is still money to be made in the second half of 2016.

VLCC Delivered to Gener8 Maritime

Gener8 Maritime, Inc., a U.S.-based provider of international seaborne crude oil transportation services, has taken delivery of the ECO VLCC the Gener8 Constantine on June 27,

 
 
Maritime Security Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0541 sec (18 req/sec)