Cammell Laird Receives Major Refit Contract

Tuesday, October 03, 2000
Cammel Laird was awarded a major UK Ministry of Defence ship refit contract involving the mid life extension of the diesel electric powered Oceanographic Research Vessel RMAS Newton, originally built in 1976 by Scotts Shipbuilding Co, Greenock Scotland. Birkenhead based marine and engineering services company, Ocean Fleets Limited were awarded, after competition a circa $7.5 million prime contract by the UK MoD, to undertake the complete design of the ship life extension package, the development of a detailed specification, the procurement of all new equipment, the competitive tender for a shipyard to undertake the refit package and the project management of the refit itself. Ocean Fleets Limited awarded the contract for the refit package to Wright & Beyer Ltd, part of Liverpool's Cammell Laird Holdings PLC. The order to supply the three new main propulsion diesel engines had earlier been placed with Ruston Diesels a division of MAN/B&W based in Newton-le-Willows also on Merseyside. The ship life extension package currently being undertaken by Cammell Laird involves replacement of the existing main propulsion diesel engines and gearboxes, improving reliability and meeting the International Maritime Organization's (IMO) standards on NOx emissions. The three new diesel engines are Ruston RK215 medium speed units each with an output of 1,360 kW at 1000 rev/min. The A.C. and D.C. generators and D.C. propulsion motors driven by the new engines will remain unchanged however the main propulsion control system which also encompasses the control of other machinery powered from a constant current loop will be significantly upgraded employing the latest technology.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

US Fleet to Pump $75m into Great Lakes Shipyards

U.S.-flag Great Lakes vessel operators plan to spend $75 million this winter to ready the fleet for the 2015 shipping season, the Lake Carriers’ Association (LCA) reported.

Keeping to the Schedule in the Pacific Northwest

When a tightly scheduled repower for the Kodiak-based trawler Sea Mac in early December took a very bad turn, Mike Fourtner used his 25 years of fishing experience

Optimarin ,Goltens Ink BWT Retrofit Agreement

Ballast Water Treatment (BWT) specialist Optimarin and Goltens, a provider of engineering and installation solutions for the shipping industry, have signed a nonexclusive

 
 
Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1320 sec (8 req/sec)