Canadian Coast Guard Vessel to Undergo Refit

Tuesday, March 28, 2006
The Canadian Coast Guard heavy icebreaker, Louis St. Laurent, will spend the next several weeks at the Halifax Shipyard undergoing refit before launching its summer program. Coast guard spokesman David Jennings said the icebreaker is in drydock for a routine inspection, which is required by the Transport Canada’s Marine Safety branch. The $2-million project will include steel work on its interior and bulkheads, work on its steering gear and removal and mandatory inspection of the rudder. The vessel, which underwent a $158-million major upgrade several years ago, will also have new deepwater sounding equipment installed before heading to the Arctic. Source: ChronicleHerald.ca

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Oil Up on US Crude Draw; Brent Back Above $50

Oil prices surged 4 percent on Wednesday, with Brent settling above the psychological $50 a barrel mark, after a larger-than-expected drawdown in U.S. crude inventories.

Baltic Index Rises on Greater Vessel Demand

The Baltic Exchange's main sea freight index, which tracks rates for ships carrying dry bulk commodities, rose on Wednesday, boosted by demand that is driving rates up across vessel segments.

CMA CGM Crosses 91.05% Ownership Threshold of NOL

CMA CGM S.A has crossed the compulsory acquisition ownership threshold in Neptune Orient Lines Limited (NOL).    Following its all-cash voluntary conditional

Coast Guard

AWO Authorizes ClassNK to Perform RCP Audits

The American Waterways Operators (AWO) and ClassNK have signed an agreement under which ClassNK will be authorized to conduct audits of AWO's Responsible Carrier Program,

Waterway Reopened after Barge Grounding

The U.S. Coast Guard has opened the Red River from mile marker 40 to mile marker 42 for vessel traffic, Monday.   The Red River had been closed due to a barge that had run aground at mile marker 41,

Red River Closed after Barge Grounding

The Red River was closed Sunday from mile marker 40 to mile marker 42, after a barge reportedly ran aground and was protruding into the channel near mile marker 41, according to the U.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0796 sec (13 req/sec)