Coast Guard Prepares EIS on LNG Project

Wednesday, October 05, 2005
The U.S. Coast Guard is preparing an environmental impact statement (EIS) regarding the proposed Northeast Gateway Energy Bridge LNG deepwater port (DWP) project. Public meetings will be held in Boston (October 18) and Gloucester (October 19). Written comments should be submitted by October 31. 70 Fed. Reg. 58228 Source: HK Law
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

CAD/CAM

3D Machining Puts Wind in the Sails

With ESPRIT CAM software, Armor Mécanique has the wind in its sails; 50% time savings, better quality and new markets thanks to 3D machining Established in 1984

SENER to Debut Latest FORAN Release at SINAVAL

SENER informs it will take active part in SINAVAL-EUROFISHING from April 21-23, a fair held every two years in Bilbao.   During the exhibition, SENER will present

LNG

JV Wins $2bln Freeport LNG Contract in US

A joint venture (JV) between CB&I, Chiyoda International and Zachry Industrial has won a contract worth over $2bn from FLNG Liquefaction 3 for a liquefied natural

Feds Delay LNG’s Port Ambrose Application

The US Coast Guard and the US Maritime Administration (MARAD) have temporarily suspended their review of the proposed Port Ambrose deep-water LNG import terminal.

GAIL Seeks 7 LNG Cargoes

GAIL (India) will buy seven liquefied natural gas (LNG) cargoes for delivery from October 2015 until December 2016, according to the tender document obtained by Reuters.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1896 sec (5 req/sec)