Coast Guard Receives New Vessel

Wednesday, October 30, 2002
The Coast Guard received a new 85-ft. patrol vessel at pier 36 in Seattle, Wash. The 85-ft. Fast Patrol Craft, designed by Jack W. Sarin Naval Architects, Inc. of Bainbridge Island, Wash and built by Guardian Marine International, LLC of Edmonds, Wash has 5,470 combined horsepower with twin Detroit Diesel engines. The ship is designed to be a high speed, all-weather vessel that is capable of speeds up to 40 knots, and a range of 1,700 nautical miles (at best economical speed). The craft comes equipped with towing capability, a small boat, and two .50 cal machine gun mounts. A test and evaluation of the Fast Patrol Craft is scheduled this fall in and around Seattle to help determine if the vessel is suitable for Coast Guard service. The Coast Guard test and evaluation is being conducted with the assistance of crew from Coast Guard Group Seattle and technicians from NAVSEA Combatant Craft Department of Suffolk, VA. "The Coast Guard appreciates the opportunity to evaluate this vessel and looks forward to putting it though its paces during the test period,” said Lt. Cmdr. Bill Brewer, from Coast Guard Headquarters, Office of Cutter Forces, in Washington, D.C., on hand to coordinate the test and evaluation. “This evaluation period is critical to see if this craft will help meet our mission requirements such as homeland security, maritime law enforcement, and search and rescue.”

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Norwegian Unions Say 755 O&G Workers Could Strike

About 755 Norwegian workers on seven oil and gas fields could go on strike from Saturday, hitting output from western Europe's top producer, if a new wage deal is not agreed before a Friday deadline,

POSH Bags Shell FLNG Contract

Singapore’s offshore marine services provider PACC Offshore Services Holdings Ltd. (POSH) has been awarded a contract to support Shell’s Prelude floating liquefied

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0670 sec (15 req/sec)