Conrad Aluminum to Deliver First Crew/Supply Boat

Wednesday, September 08, 2004

By Larry Pearson

Conrad Industries, Morgan City, La. opened a crew/supply boat fabrication and repair facility in nearby Amelia, La. about a year ago. Since that time they have used their 330-ton Marine Travelift to haul out and repair various crew boats.

"We do a lot of basic underwater repairs such as shafts, props and rudders, said Jerry Hoffpauir, general manager of Conrad Aluminum. The 16-acre facility sits on Route 90 in the heart of south Louisiana boat building country. The company also built a two bay fabrication building on the site and one of those bays hold what Conrad thinks will be the future of this facility.

Conrad Aluminum is building a 180-ft. by 32-ft. aluminum crew/supply boat for Diamond Services, also of Amelia. The vessel is water jet powered as are all but one of Diamond Services crew/supply vessels. The vessel is powered by a quartet of Cummins KTA 38 engines rated at 1250 hp each driving Hamilton waterjets.

Cummins also supplied two 100 kW gensets. A 100 hp Thrustmaster bow thruster completes the drive package. Speed will be above 30 knots and delivery is expected in October 2004. The 114-ft. by 26-ft. rear deck can hold 280 U.S. tons of cargo. There is berthing for nine people and seats for 100 passengers. Below deck there are tanks for 30,00 gallons of fuel and 35,000 gallons of rig water. The naval architecture firm of A.K. Suda Inc., designed the vessel of Metairie, La.Suda's crew boat design allows a USCG Subchapter T designation without the use of deep tonnage frames or tonnage openings. The elimination of these frames not only saves the cost of the aluminum, but also makes for a more spacious hull, allowing for passenger seating in both the hull and main deck levels. The elimination of the tonnage frames also means that tank areas are unobstructed by these frames and are easier to clean.

The addition of Conrad to the five other major crew/supply boat builders is a reflection of the state of offshore vessel construction in the oil patch in general. Supply vessel construction is down significantly, but building of crew/supply vessels remains as strong as in years past.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Workboats

Pair of ASD Tugboats Delivered to Keppel-Smit

The ASD tugs KST Passion and KST Pride were were delivered to their owner, Keppel-Smit Towage Pte. Ltd of Singapore in October 2014. The two vessels are the first

Ice to Close Upper Mississippi from Nov. 20

The shipping season on the upper Mississippi River will end on Thursday as ice surrounding locks and dams near Minnesota's Twin Cities forced the earliest winter

RSC Bio Solutions: SVGP Compliant Fluids & Cleaners

RSC Bio Solutions said that its EnviroLogic Environmentally Acceptable Lubricants (EALs), including hydraulic, stern tube and thruster oils, and SAFECARE cleaners

Maritime Security

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Bouchard Vessels Honored by SCA

Forty-three Bouchard Transportation Co., Inc. vessels have been honored by The Chamber of Shipping America (CSA) with Certificates of Environmental Achievement.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1588 sec (6 req/sec)