Contract Signed for SemiSub Platform

Monday, November 27, 2006
Statoil and Aker Kværner has signed the contract worth approximately NOK 8 billion for the semisubmersible platform to be located at the Gjøa field offshore Norway. This is in accordance with the memorandum of understanding presented in Aker Kvaerner's disclosure to the Oslo Stock Exhange at 29 September 2006. The scope of work to be performed by Aker Kvaerner will be detail design of topside and hull, procurement, construction and hook-up of topside, and mating of topside and hull. Detailed engineering will be headed from Aker Kvaerner's office in Oslo, and a significant part of the engineering hours will be carried out by Aker Kvaerner's engineering entity in Mumbai in India. In total, more than 500 Aker Kvaerner engineers will be mobilised to design the platform. Peak manning will reach approximately 2000 persons. The platform will be constructed at Aker Kvaerner Stord AS, who also is Statoil ASA's contract partner. Several Aker Kvaerner companies will deliver to Gjøa.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

New Double-ended Ferry for Norderney

New double-ended ferry serving the North Sea island of Norderney – Safe and eco-friendly maneuvering in shallow, high-sediment water using Voith Schneider Propellers Ferries

Latest Ocean-Going Shipbuilding Orders

Clarkson Hellas notes in its latest 'S&P Weekly Bulletin' shipbuilding orders placed in the dry bulk, tankship, gas carrier and containership sectors, as follows: Dry

Offshore

CWind Wins 3-year O&M Services Contract

CWind, a provider of services to the offshore wind industry, have signed a three-year contract to provide crew and equipment transfer for DONG Energy and Scottish

UK's Hound Point VLCC Jetty Down Until Sept. 15

The supertanker jetty at the North Sea's Hound Point crude oil terminal is shut for maintenance and will not reopen until Sept. 15, operator BP Plc said on Thursday,

Joint Petroleum Development in South China Sea Makes Sense

Shared development of oil, gas and possibly other natural resources is the most promising option for reducing tensions in the South China Sea and should be the

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1003 sec (10 req/sec)