Contractor Selection for Goliat FPSO Still Open

Tuesday, February 03, 2009

The operator of the Goliat field in the Barents Sea, Eni, announced the selection of concept for the Goliat FPSO.

“We respect that Eni has chosen a different concept than the one we presented in our offer. We are satisfied that Eni today commented that they have not awarded the contract for the engineering, procurement and construction (EPC) of the project, which the tender originally implied. The choice of contractor remains open, which means that we can still win the job to build the FPSO," said Jannik Lindbaek jr, SVP for corporate communications at Aker Solutions.
 
Eni will open a new tendering process. The competition will then be for the EPC-contract on the building of the Goliat FPSO, based on the concept selected.
 
"Aker Solutions has in the past time and again demonstrated the competence, capacity and execution capabilities for delivery of large, complex projects. We are in a good position to present a competitive delivery model and tender for this EPC contract," said Lindbaek.
 
The construction of the hull will most likely be undertaken outside Norway.
 
"We will strive to secure that the construction of the topside and processing modules, as well as the hook up can be done in Norway. This would mean that a substantial amount of the value creation in relation to the EPC contract can take place in Norway," said Lindbaek.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Royal IHC Launches Sapura Jade

Royal IHC has named and launched the pipelaying vessel Sapura Jade in a ceremony at the company’s shipyard in Krimpen aan den IJssel, The Netherlands.   The

Siemens Wins Vessel Electrical Installation Contract

Nautilus Minerals Inc. announces that the order for the supply of the entire electrical installation for the production support vessel has been awarded to Siemens International Trading (Shanghai) Ltd.

Delivery Begins for HMS Prince of Wales Bridge

The bridge section of the U.K.’s second Queen Elizabeth Class aircraft carrier has been loaded out of its dock hall in Glasgow ahead of its first sea voyage to Rosyth.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3214 sec (3 req/sec)